IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,058

matching recommendations
Reset
NAICS 33231 Plate Work and Fabricated Structural Product Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MZ0316 # 05 Y:2021 05 2021 PURCHASE NEW EQUIPMENT TO REDUCE MATERIAL USE / COST $12,219 $40,130 Not Implemented
MZ0316 # 06 Y:2021 06 2021 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $5,527 $1,395 Not Implemented
MZ0316 # 07 Y:2021 07 2021 USE INSULATION IN FURNACES TO FACILITATE HEATING / COOLING $2,786 $11,055 Implemented
MZ0316 # 08 Y:2021 08 2021 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $5,866 $3,614 Implemented
MZ0316 # 09 Y:2021 09 2021 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $9,528 $625 Not Implemented
MZ0316 # 10 Y:2021 10 2021 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,220 $3,485 Implemented
MZ0310 # 01 Y:2021 01 2021 TURN OFF EQUIPMENT WHEN NOT IN USE $6,274 $490 Not Implemented
MZ0310 # 02 Y:2021 02 2021 BASE UTILITY CHARGES ON USAGE RATHER THAN AREA OCCUPIED $3,630 $1,160 Not Implemented
MZ0310 # 03 Y:2021 03 2021 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $2,250 $2,580 Not Implemented
MZ0310 # 04 Y:2021 04 2021 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,165 $1,896 Not Implemented
WV0607 # 01 Y:2021 01 2021 UPGRADE CONTROLS ON COMPRESSORS $14,736 $14,181 Not Implemented
WV0607 # 02 Y:2021 02 2021 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,236 $13,076 Not Implemented
WV0607 # 03 Y:2021 03 2021 RECOVER WASTE HEAT FROM EQUIPMENT $3,155 $2,492 Not Implemented
WV0607 # 04 Y:2021 04 2021 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,519 $50 Implemented
WV0607 # 05 Y:2021 05 2021 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $635 $1,054 Implemented
WV0607 # 06 Y:2021 06 2021 DEVELOP A REPAIR/REPLACE POLICY $326 $358 Implemented
WV0607 # 07 Y:2021 07 2021 OPTIMIZE PLANT POWER FACTOR $321 $1,410 Not Implemented
OR0738 # 01 Y:2021 01 2021 TRAIN OPERATORS FOR MAXIMUM OPERATING EFFICIENCY $242,489 $81,465 Not Implemented
OR0738 # 02 Y:2021 02 2021 OPTIMIZE PLANT POWER FACTOR $13,131 $8,725 Not Implemented
OR0738 # 03 Y:2021 03 2021 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,831 $1,000 Not Implemented
NL0052 # 01 Y:2020 01 2020 UPGRADE CONTROLS ON COMPRESSORS $11,815 $4,420 Not Implemented
NL0052 # 02 Y:2020 02 2020 RE-SIZE CHARGING OPENINGS OR ADD A MOVABLE DOOR ON EQUIPMENT $5,190 $6,320 Not Implemented
NL0052 # 03 Y:2020 03 2020 METER WASTE WATER $4,017 $580 Implemented
NL0052 # 04 Y:2020 04 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,375 $2,354 Implemented
NL0052 # 05 Y:2020 05 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,620 $2,000 Implemented