IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

54

matching recommendations
Reset
NAICS 33231 Plate Work and Fabricated Structural Product Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SF0592 # 06 Y:2023 06 2023 CHANGE PRODUCT DESIGN TO REDUCE ENERGY REQUIREMENTS $8,739 $30,000 Implemented
SF0592 # 05 Y:2023 05 2023 INSULATE BARE EQUIPMENT $13,506 $24,333 Implemented
SF0592 # 04 Y:2023 04 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,309 $1,263 Implemented
SF0592 # 03 Y:2023 03 2023 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $1,682 $0 Implemented
SF0592 # 02 Y:2023 02 2023 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $10,009 $0 Implemented
SF0592 # 01 Y:2023 01 2023 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $8,569 $0 Implemented
SF0525 # 01 Y:2018 01 2018 TURN OFF EQUIPMENT WHEN NOT IN USE $49,766 $0 Implemented
SF0525 # 04 Y:2018 04 2018 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $3,086 $354 Not Implemented
SF0525 # 06 Y:2018 06 2018 USE SOLAR HEAT TO MAKE ELECTRICTY $124,618 $491,526 Not Implemented
SF0525 # 05 Y:2018 05 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $60,368 $59,620 Implemented
SF0525 # 03 Y:2018 03 2018 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,078 $160 Implemented
SF0525 # 02 Y:2018 02 2018 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $16,260 $0 Implemented
SF0473 # 06 Y:2015 06 2015 UPGRADE CONTROLS ON COMPRESSORS $10,962 $10,585 Implemented
SF0473 # 07 Y:2015 07 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $24,885 $76,232 Implemented
SF0473 # 08 Y:2015 08 2015 USE SOLAR HEAT TO MAKE ELECTRICTY $121,903 $1,110,964 Implemented
SF0473 # 09 Y:2015 09 2015 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER $677 $0 Implemented
SF0473 # 01 Y:2015 01 2015 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $7,057 $0 Not Implemented
SF0473 # 02 Y:2015 02 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,181 $0 Implemented
SF0473 # 05 Y:2015 05 2015 INSTALL OCCUPANCY SENSORS $3,208 $2,648 Not Implemented
SF0473 # 04 Y:2015 04 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $951 $144 Implemented
SF0473 # 03 Y:2015 03 2015 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,523 $66 Not Implemented
SD0515 # 09 Y:2015 09 2015 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $931 $3,050 Not Implemented
SD0515 # 08 Y:2015 08 2015 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $948 $3,375 Not Implemented
SD0515 # 01 Y:2015 01 2015 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT $209,960 $1,040,000 Not Implemented
SD0515 # 02 Y:2015 02 2015 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $163,675 $32,788 Not Implemented