IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

54

matching recommendations
Reset
NAICS 33231 Plate Work and Fabricated Structural Product Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UL2202 # 08 Y:2022 08 2022 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $6,941 $0 Implemented
UL2202 # 07 Y:2022 07 2022 DEVELOP A REPAIR/REPLACE POLICY $495 $4,750 Not Implemented
UL2202 # 06 Y:2022 06 2022 USE SOLAR HEAT TO MAKE ELECTRICTY $50,126 $1,220,427 Not Implemented
UL2202 # 05 Y:2022 05 2022 OPTIMIZE PLANT POWER FACTOR $16,897 $12,250 Not Implemented
UL2202 # 04 Y:2022 04 2022 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $649 $0 Not Implemented
UL2202 # 03 Y:2022 03 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,677 $0 Implemented
UL2202 # 02 Y:2022 02 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,861 $12,941 Implemented
UL2202 # 01 Y:2022 01 2022 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $23,158 $0 Implemented
UK1806 # 01 Y:2018 01 2018 UPGRADE CONTROLS ON COMPRESSORS $10,567 $9,500 n/a
UK1806 # 04 Y:2018 04 2018 RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR $17,440 $18,575 n/a
UK1806 # 07 Y:2018 07 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $35,583 $99,639 n/a
UK1806 # 12 Y:2018 12 2018 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $1,467 $0 n/a
UK1806 # 10 Y:2018 10 2018 OPTIMIZE PLANT POWER FACTOR $6,117 $6,090 n/a
UK1806 # 05 Y:2018 05 2018 USE RADIANT HEATER FOR SPOT HEATING $14,227 $14,700 n/a
UK1806 # 06 Y:2018 06 2018 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $456 $0 n/a
UK1806 # 11 Y:2018 11 2018 TURN OFF EQUIPMENT WHEN NOT IN USE $3,087 $775 n/a
UK1806 # 03 Y:2018 03 2018 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $3,312 $1,100 n/a
UK1806 # 13 Y:2018 13 2018 USE PLASTIC PALLETS INSTEAD OF WOOD $8,000 $18,890 n/a
UK1806 # 09 Y:2018 09 2018 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,069 $4,175 n/a
UK1806 # 08 Y:2018 08 2018 USE PHOTOCELL CONTROLS $1,514 $2,900 n/a
UK1806 # 02 Y:2018 02 2018 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,221 $0 n/a
WV0428 # 12 Y:2011 12 2011 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $5,254 $3,010 Not Implemented
WV0428 # 03 Y:2011 03 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $40,236 $60,550 Implemented
WV0428 # 16 Y:2011 16 2011 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,125 $3,000 Not Implemented
WV0428 # 15 Y:2011 15 2011 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,154 $25 Implemented