IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

51

matching recommendations
Reset
NAICS 33231 Plate Work and Fabricated Structural Product Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD1116 # 06 Y:2025 06 2025 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,166 $5,318 n/a
UD1116 # 05 Y:2025 05 2025 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $251 $0 n/a
UD1116 # 04 Y:2025 04 2025 CENTRALIZE CONTROL OF EXHAUST FANS TO ENSURE THEIR SHUTDOWN, OR ESTABLISH PROGRAM TO ENSURE MANUAL SHUTDOWN $2,842 $908 n/a
UD1116 # 03 Y:2025 03 2025 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $4,126 $5,813 n/a
UD1116 # 02 Y:2025 02 2025 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $9,462 $15,035 n/a
UD1116 # 01 Y:2025 01 2025 TURN OFF EQUIPMENT WHEN NOT IN USE $1,791 $0 n/a
UD1116 # 07 Y:2025 07 2025 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $712 $1,015 n/a
UD1116 # 08 Y:2025 08 2025 OPTIMIZE PLANT POWER FACTOR $1,999 $5,700 n/a
UD1048 # 02 Y:2022 02 2022 INSTALL OCCUPANCY SENSORS $1,915 $625 Not Implemented
UD1048 # 01 Y:2022 01 2022 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE $15,150 $1,500 Not Implemented
UD1048 # 03 Y:2022 03 2022 DISCONNECT BALLASTS $1,787 $0 Implemented
UD1048 # 04 Y:2022 04 2022 TURN OFF EQUIPMENT WHEN NOT IN USE $4,481 $35 Not Implemented
UD1048 # 05 Y:2022 05 2022 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $4,115 $1,409 Not Implemented
UD1048 # 06 Y:2022 06 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,737 $952 Not Implemented
UD1048 # 07 Y:2022 07 2022 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,039 $0 Not Implemented
UD1048 # 08 Y:2022 08 2022 OPTIMIZE FILTRATION CLEANING / REPLACEMENT TO MINIMIZE AIR RESISTANCE $573 $1,065 Not Implemented
UD0928 # 10 Y:2015 10 2015 INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN $5,622 $25,000 Not Implemented
UD0928 # 01 Y:2015 01 2015 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $10,389 $0 Not Implemented
UD0928 # 02 Y:2015 02 2015 USE RADIANT HEATER FOR SPOT HEATING $153,677 $48,000 Not Implemented
UD0928 # 08 Y:2015 08 2015 INSTALL MOTOR VOLTAGE CONTROLLER ON LIGHTLY LOADED MOTORS $11,986 $18,300 Not Implemented
UD0928 # 07 Y:2015 07 2015 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $154,780 $150,000 Not Implemented
UD0928 # 06 Y:2015 06 2015 COVER OPEN TANKS $2,876 $2,196 Not Implemented
UD0928 # 05 Y:2015 05 2015 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $52,184 $105,000 Not Implemented
UD0928 # 04 Y:2015 04 2015 INSTALL OCCUPANCY SENSORS $2,735 $12,995 Not Implemented
UD0928 # 03 Y:2015 03 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $314,492 $152,750 Not Implemented