Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
42
matching recommendationsNAICS | 33231 | Plate Work and Fabricated Structural Product Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
AM0626 # 02 Y:2012 | 02 | 2012 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $10,300 | $19,670 | Implemented |
AM0626 # 03 Y:2012 | 03 | 2012 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,990 | $350 | Implemented |
AM0626 # 04 Y:2012 | 04 | 2012 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $975 | $15 | Implemented |
AM0626 # 05 Y:2012 | 05 | 2012 | USE SYNTHETIC LUBRICANT | $285 | $0 | Implemented |
AM0626 # 06 Y:2012 | 06 | 2012 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $250 | $15 | Implemented |
AM0626 # 07 Y:2012 | 07 | 2012 | INSTALL SKYLIGHTS | $3,330 | $10,400 | Not Implemented |
AM0626 # 08 Y:2012 | 08 | 2012 | INSTALL SKYLIGHTS | $1,300 | $3,170 | Not Implemented |
AM0626 # 09 Y:2012 | 09 | 2012 | INSTALL SKYLIGHTS | $520 | $1,410 | Not Implemented |
AM0626 # 01 Y:2012 | 01 | 2012 | CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS | $10,800 | $600 | Not Implemented |
IA0486 # 04 Y:2012 | 04 | 2012 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $462 | $448 | Implemented |
IA0486 # 03 Y:2012 | 03 | 2012 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $362 | $420 | Implemented |
IA0486 # 02 Y:2012 | 02 | 2012 | RECOVER WASTE HEAT FROM EQUIPMENT | $415 | $350 | Implemented |
IA0486 # 01 Y:2012 | 01 | 2012 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $904 | $2,721 | Not Implemented |
IA0486 # 05 Y:2012 | 05 | 2012 | ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | $8,985 | $8,186 | Implemented |
LE0337 # 01 Y:2012 | 01 | 2012 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $54,631 | $28,000 | Not Implemented |
LE0337 # 02 Y:2012 | 02 | 2012 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $17,684 | $1,000 | Not Implemented |
LE0337 # 03 Y:2012 | 03 | 2012 | INSTALL OCCUPANCY SENSORS | $11,678 | $19,140 | Not Implemented |
LE0337 # 04 Y:2012 | 04 | 2012 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,020 | $1,562 | Not Implemented |
LE0337 # 05 Y:2012 | 05 | 2012 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $3,107 | $2,500 | Not Implemented |
LE0333 # 06 Y:2012 | 06 | 2012 | REDUCE HEAT GAIN BY WINDOW TINTING | $4,369 | $0 | Not Implemented |
LE0333 # 05 Y:2012 | 05 | 2012 | RECOVER WASTE HEAT FROM EQUIPMENT | $1,865 | $1,000 | Not Implemented |
LE0333 # 04 Y:2012 | 04 | 2012 | MINIMIZE USE OF OUTSIDE MAKE-UP AIR FOR VENTILATION EXCEPT WHEN USED FOR ECONOMIZER CYCLE | $1,111 | $14,190 | Not Implemented |
LE0333 # 03 Y:2012 | 03 | 2012 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $6,424 | $1,000 | Not Implemented |
LE0333 # 02 Y:2012 | 02 | 2012 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,876 | $12,800 | Not Implemented |
LE0333 # 01 Y:2012 | 01 | 2012 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,510 | $7,490 | Not Implemented |