IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

37

matching recommendations
Reset
NAICS 332312 Fabricated Structural Metal Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MI0197 # 07 Y:2010 07 2010 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $4,983 $2,040 Implemented
MI0197 # 06 Y:2010 06 2010 ELIMINATE LEAKS IN WATER LINES AND VALVES $1,187 $180 Implemented
MI0197 # 05 Y:2010 05 2010 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $1,359 $2,850 Not Implemented
MI0197 # 04 Y:2010 04 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,824 $7,562 Not Implemented
MI0197 # 03 Y:2010 03 2010 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,594 $40 Not Implemented
MI0197 # 02 Y:2010 02 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $10,774 $1,210 Implemented
MI0197 # 01 Y:2010 01 2010 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $23,798 $2,550 Not Implemented
CO0639 # 06 Y:2010 06 2010 USE SOLAR HEAT TO MAKE ELECTRICTY $2,050 $35,000 Not Implemented
CO0639 # 01 Y:2010 01 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,180 $340 Implemented
CO0639 # 02 Y:2010 02 2010 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $1,600 $10,320 Not Implemented
CO0639 # 03 Y:2010 03 2010 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,040 $13,990 Not Implemented
CO0639 # 04 Y:2010 04 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,710 $33,800 Not Implemented
CO0639 # 05 Y:2010 05 2010 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $1,060 $3,620 Not Implemented
BD0371 # 02 Y:2010 02 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $17,099 $59,000 Implemented
BD0371 # 09 Y:2010 09 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $383 $300 n/a
BD0371 # 08 Y:2010 08 2010 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $826 $1,200 Not Implemented
BD0371 # 07 Y:2010 07 2010 USE SYNTHETIC LUBRICANT $1,752 $900 Not Implemented
BD0371 # 06 Y:2010 06 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,199 $8,511 Implemented
BD0371 # 05 Y:2010 05 2010 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $5,027 $10,100 Not Implemented
BD0371 # 04 Y:2010 04 2010 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $5,181 $10 Implemented
BD0371 # 03 Y:2010 03 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,855 $4,900 Implemented
BD0371 # 01 Y:2010 01 2010 USE RADIANT HEATER FOR SPOT HEATING $18,738 $7,700 Not Implemented
UD0812 # 01 Y:2010 01 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $11,236 $19,740 Not Implemented
UD0812 # 02 Y:2010 02 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,893 $6,240 Not Implemented
UD0812 # 03 Y:2010 03 2010 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $1,148 $0 Not Implemented