Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
41
matching recommendationsNAICS | 332312 | Fabricated Structural Metal Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
SU0555 # 15 Y:2024 | 15 | 2024 | USE SOLAR HEAT TO MAKE ELECTRICTY | $31,541 | $219,132 | n/a |
SU0555 # 01 Y:2024 | 01 | 2024 | PAY BILLS ON TIME TO AVOID LATE FEES | $923 | $0 | n/a |
SU0555 # 02 Y:2024 | 02 | 2024 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $2,613 | $0 | n/a |
SU0555 # 03 Y:2024 | 03 | 2024 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $1,450 | $0 | n/a |
SU0555 # 04 Y:2024 | 04 | 2024 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $2,049 | $70 | n/a |
SU0555 # 05 Y:2024 | 05 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,994 | $104 | n/a |
SU0555 # 06 Y:2024 | 06 | 2024 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $1,650 | $115 | n/a |
SU0555 # 07 Y:2024 | 07 | 2024 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $362 | $128 | n/a |
SU0555 # 08 Y:2024 | 08 | 2024 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $600 | $292 | n/a |
SU0555 # 09 Y:2024 | 09 | 2024 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $603 | $344 | n/a |
SU0555 # 10 Y:2024 | 10 | 2024 | IMPLEMENT A REGULAR MAINTENANCE PROGRAM TO REDUCE EMISSIONS FROM LEAKY VALVES AND PIPE FITTINGS | $1,795 | $1,172 | n/a |
SU0555 # 11 Y:2024 | 11 | 2024 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $823 | $1,347 | n/a |
SU0555 # 12 Y:2024 | 12 | 2024 | REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT | $61,520 | $301,550 | n/a |
SU0555 # 13 Y:2024 | 13 | 2024 | CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES | $101 | $498 | n/a |
SU0555 # 14 Y:2024 | 14 | 2024 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $7,140 | $35,125 | n/a |
KS2429 # 04 Y:2024 | 04 | 2024 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $12,730 | $126,398 | n/a |
KS2429 # 05 Y:2024 | 05 | 2024 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $9,984 | $26,926 | n/a |
KS2429 # 06 Y:2024 | 06 | 2024 | INSTALL OCCUPANCY SENSORS | $6,211 | $6,604 | n/a |
KS2429 # 03 Y:2024 | 03 | 2024 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,838 | $90 | n/a |
KS2429 # 02 Y:2024 | 02 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $6,105 | $5,480 | n/a |
KS2429 # 01 Y:2024 | 01 | 2024 | USE SOLAR HEAT TO MAKE ELECTRICTY | $57,379 | $484,288 | n/a |
AM0910 # 02 Y:2024 | 02 | 2024 | APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES | $46,540 | $7,723 | n/a |
AM0910 # 01 Y:2024 | 01 | 2024 | USE SOLAR HEAT TO MAKE ELECTRICTY | $20,462 | $371,576 | n/a |
AM0910 # 03 Y:2024 | 03 | 2024 | OPTIMIZE PLANT POWER FACTOR | $6,300 | $13,285 | n/a |
AM0910 # 04 Y:2024 | 04 | 2024 | TURN OFF EQUIPMENT WHEN NOT IN USE | $3,477 | $2,200 | n/a |