IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

219

matching recommendations
Reset
NAICS 332313 Plate Work Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MI0335 # 08 Y:2018 08 2018 RECOVER WASTE HEAT FROM EQUIPMENT $1,157 $5,370 Implemented
MI0335 # 07 Y:2018 07 2018 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,235 $2,520 Implemented
MI0335 # 06 Y:2018 06 2018 TRAIN OPERATORS FOR MAXIMUM OPERATING EFFICIENCY $1,505 $480 Implemented
MI0335 # 05 Y:2018 05 2018 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $1,932 $7,536 Implemented
MI0335 # 04 Y:2018 04 2018 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $2,798 $7,385 Implemented
MI0335 # 03 Y:2018 03 2018 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,894 $2,030 Implemented
MI0335 # 02 Y:2018 02 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,167 $8,063 Implemented
MI0335 # 01 Y:2018 01 2018 TURN OFF EQUIPMENT WHEN NOT IN USE $4,545 $3,280 Implemented
MZ0249 # 01 Y:2018 01 2018 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $607 $1,750 Implemented
MZ0249 # 05 Y:2018 05 2018 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,399 $0 Implemented
MZ0249 # 04 Y:2018 04 2018 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $115 $0 Implemented
MZ0249 # 03 Y:2018 03 2018 INSTALL OCCUPANCY SENSORS $257 $340 Implemented
MZ0249 # 02 Y:2018 02 2018 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $10,248 $15,240 Implemented
CO0732 # 02 Y:2016 02 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,690 $840 n/a
CO0732 # 01 Y:2016 01 2016 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $11,620 $12,560 n/a
CO0732 # 03 Y:2016 03 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $20,070 $46,190 n/a
OK0935 # 04 Y:2016 04 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,207 $5,310 Not Implemented
OK0935 # 10 Y:2016 10 2016 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC $1,167 $1,000 Not Implemented
OK0935 # 09 Y:2016 09 2016 COVER OPEN TANKS $8,035 $1,510 Not Implemented
OK0935 # 08 Y:2016 08 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,682 $1,170 Not Implemented
OK0935 # 07 Y:2016 07 2016 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $35,782 $17,000 Not Implemented
OK0935 # 05 Y:2016 05 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $765 $3,682 Not Implemented
OK0935 # 06 Y:2016 06 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $19,536 $51,920 Not Implemented
OK0935 # 01 Y:2016 01 2016 INSTALL SET-BACK TIMERS $7,525 $5,775 Not Implemented
OK0935 # 03 Y:2016 03 2016 RECOVER WASTE HEAT FROM EQUIPMENT $4,052 $1,913 Not Implemented