Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
36
matching recommendationsNAICS | 33232 | Ornamental and Architectural Metal Products Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
TT0280 # 06 Y:2022 | 06 | 2022 | INSTALL TIMERS AND/OR THERMOSTATS | $14,562 | $650 | Not Implemented |
TT0280 # 05 Y:2022 | 05 | 2022 | REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT | $19,766 | $0 | Implemented |
TT0280 # 10 Y:2022 | 10 | 2022 | DEVELOP A REPAIR/REPLACE POLICY | $298 | $1,247 | Not Implemented |
TT0280 # 09 Y:2022 | 09 | 2022 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $1,550 | $0 | Not Implemented |
TT0280 # 08 Y:2022 | 08 | 2022 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $2,072 | $3,400 | Not Implemented |
TT0280 # 07 Y:2022 | 07 | 2022 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $2,878 | $5,100 | Not Implemented |
TT0280 # 04 Y:2022 | 04 | 2022 | TURN OFF EQUIPMENT WHEN NOT IN USE | $21,150 | $0 | Implemented |
TT0280 # 03 Y:2022 | 03 | 2022 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $26,518 | $6,720 | Not Implemented |
TT0280 # 02 Y:2022 | 02 | 2022 | SUBSTITUTE COMPRESSED AIR COOLING WITH WATER OR AIR COOLING | $29,003 | $9,880 | Implemented |
TT0280 # 01 Y:2022 | 01 | 2022 | MODIFY PROCESS TO REDUCE MATERIAL USE/COST | $52,932 | $4,800 | Implemented |
TT0274 # 04 Y:2022 | 04 | 2022 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $1,530 | $0 | Implemented |
TT0274 # 07 Y:2022 | 07 | 2022 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,129 | $1,700 | Not Implemented |
TT0274 # 06 Y:2022 | 06 | 2022 | SUBSTITUTE COMPRESSED AIR COOLING WITH WATER OR AIR COOLING | $1,438 | $1,240 | Not Implemented |
TT0274 # 05 Y:2022 | 05 | 2022 | UPGRADE CONTROLS ON COMPRESSORS | $1,507 | $2,040 | Not Implemented |
TT0274 # 03 Y:2022 | 03 | 2022 | DEVELOP A REPAIR/REPLACE POLICY | $2,258 | $2,000 | Not Implemented |
TT0274 # 02 Y:2022 | 02 | 2022 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $4,579 | $18,000 | Implemented |
TT0274 # 01 Y:2022 | 01 | 2022 | INSTALL TIMERS AND/OR THERMOSTATS | $5,185 | $9,150 | Not Implemented |
TT0266 # 01 Y:2022 | 01 | 2022 | LEVEL TWO – INSTALL CONTROL SYSTEM USING IIOT DEVICES WITH COMMUNICATION CAPABILITIES TO STORE DATA TO THE CLOUD | $32,000 | $3,900 | Implemented |
TT0266 # 02 Y:2022 | 02 | 2022 | USE SOLAR HEAT TO MAKE ELECTRICTY | $11,120 | $138,300 | Not Implemented |
TT0266 # 04 Y:2022 | 04 | 2022 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,458 | $6,147 | Implemented |
TT0266 # 03 Y:2022 | 03 | 2022 | AVOID INTRODUCING HOT, HUMID, OR DIRTY AIR INTO HVAC SYSTEM | $4,496 | $2,400 | Implemented |
TT0266 # 05 Y:2022 | 05 | 2022 | INSTALL TIMERS AND/OR THERMOSTATS | $2,049 | $1,100 | Implemented |
TT0154 # 07 Y:2015 | 07 | 2015 | TURN OFF EQUIPMENT WHEN NOT IN USE | $326 | $460 | Not Implemented |
TT0154 # 06 Y:2015 | 06 | 2015 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,216 | $2,000 | Not Implemented |
TT0154 # 05 Y:2015 | 05 | 2015 | APPLY FOR INVESTMENT INCENTIVES | $5,176 | $40 | Implemented |