Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
427
matching recommendationsNAICS | 332321 | Metal Window and Door Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MI0431 # 01 Y:2023 | 01 | 2023 | UTILIZE A LESS EXPENSIVE COOLING METHOD | $11,840 | $55,500 | n/a |
MI0431 # 04 Y:2023 | 04 | 2023 | INSTALL OCCUPANCY SENSORS | $8,323 | $680 | n/a |
MI0431 # 05 Y:2023 | 05 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $7,269 | $1,020 | n/a |
MI0431 # 06 Y:2023 | 06 | 2023 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $5,030 | $80 | n/a |
MI0431 # 07 Y:2023 | 07 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $816 | $1,400 | n/a |
MI0431 # 03 Y:2023 | 03 | 2023 | OPTIMIZE PLANT POWER FACTOR | $8,963 | $16,003 | n/a |
MI0431 # 02 Y:2023 | 02 | 2023 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $10,760 | $11,272 | n/a |
SD0642 # 01 Y:2023 | 01 | 2023 | INSTALL DIRECT ACTING UNITS IN PLACE OF COMPRESSED AIR PRESSURE SYSTEM IN SAFETY SYSTEM | $1,793 | $2,300 | n/a |
SD0642 # 02 Y:2023 | 02 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,958 | $14,573 | n/a |
SD0642 # 03 Y:2023 | 03 | 2023 | USE MORE EFFICIENT ADHESIVE APPLICATORS | $14,334 | $2,200 | n/a |
SD0642 # 05 Y:2023 | 05 | 2023 | USE SOLAR HEAT TO MAKE ELECTRICTY | $44,733 | $141,268 | n/a |
SD0642 # 08 Y:2023 | 08 | 2023 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $1,872 | $2,290 | n/a |
SD0642 # 07 Y:2023 | 07 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $325 | $847 | n/a |
SD0642 # 04 Y:2023 | 04 | 2023 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,070 | $500 | n/a |
SD0642 # 06 Y:2023 | 06 | 2023 | USE BATTERY STORAGE FOR DEMAND CONTROL | $4,384 | $0 | n/a |
SD0642 # 09 Y:2023 | 09 | 2023 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $4,066 | $5,607 | n/a |
NL0070 # 01 Y:2022 | 01 | 2022 | USE RADIANT HEATER FOR SPOT HEATING | $41,224 | $20,136 | Not Implemented |
NL0070 # 05 Y:2022 | 05 | 2022 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $4,030 | $4,945 | Not Implemented |
NL0070 # 06 Y:2022 | 06 | 2022 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,590 | $23,500 | Implemented |
NL0070 # 04 Y:2022 | 04 | 2022 | AVOID INTRODUCING HOT, HUMID, OR DIRTY AIR INTO HVAC SYSTEM | $6,619 | $1,180 | Not Implemented |
NL0070 # 07 Y:2022 | 07 | 2022 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $675 | $3,315 | Implemented |
NL0070 # 08 Y:2022 | 08 | 2022 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $490 | $854 | Implemented |
NL0070 # 02 Y:2022 | 02 | 2022 | UPGRADE CONTROLS ON COMPRESSORS | $32,832 | $16,500 | Implemented |
NL0070 # 03 Y:2022 | 03 | 2022 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $26,148 | $35 | Implemented |
TT0280 # 01 Y:2022 | 01 | 2022 | MODIFY PROCESS TO REDUCE MATERIAL USE/COST | $52,932 | $4,800 | Implemented |