IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

590

matching recommendations
Reset
NAICS 332322 Sheet Metal Work Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
DL0050 # 04 Y:2010 04 2010 COVER OPEN TANKS $263 $275 Not Implemented
DL0050 # 05 Y:2010 05 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,850 $34,600 Implemented
SD0418 # 01 Y:2009 01 2009 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,279 $5,868 Not Implemented
SD0418 # 02 Y:2009 02 2009 INSTALL OCCUPANCY SENSORS $205 $246 Implemented
SD0418 # 03 Y:2009 03 2009 INSTALL TIMERS AND/OR THERMOSTATS $1,671 $500 Not Implemented
SD0418 # 04 Y:2009 04 2009 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,141 $4,207 Not Implemented
SD0418 # 05 Y:2009 05 2009 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $198 $0 Not Implemented
AM0556 # 01 Y:2009 01 2009 REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT $110,800 $325,000 Not Implemented
AM0556 # 02 Y:2009 02 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $27,000 $36,100 Implemented
AM0556 # 03 Y:2009 03 2009 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $13,800 $1,000 Implemented
AM0556 # 04 Y:2009 04 2009 OPTIMIZE PLANT POWER FACTOR $6,510 $21,230 Not Implemented
AM0556 # 05 Y:2009 05 2009 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $5,650 $11,713 Implemented
AM0556 # 06 Y:2009 06 2009 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $4,980 $3,900 Not Implemented
AM0556 # 07 Y:2009 07 2009 INSTALL SKYLIGHTS $3,200 $4,140 Not Implemented
AM0556 # 08 Y:2009 08 2009 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $3,290 $1,000 Implemented
AM0556 # 09 Y:2009 09 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,730 $8,200 Implemented
AM0556 # 10 Y:2009 10 2009 USE SYNTHETIC LUBRICANT $1,405 $0 Not Implemented
AM0556 # 11 Y:2009 11 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $105 $82 Not Implemented
MZ0027 # 01 Y:2008 01 2008 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $4,642 $900 Not Implemented
MZ0027 # 02 Y:2008 02 2008 RE-SIZE CHARGING OPENINGS OR ADD A MOVABLE DOOR ON EQUIPMENT $514 $1,400 Not Implemented
MZ0027 # 03 Y:2008 03 2008 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,465 $1,400 Not Implemented
MZ0027 # 04 Y:2008 04 2008 USE OPTIMUM THICKNESS INSULATION $76 $300 Not Implemented
MZ0027 # 05 Y:2008 05 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,444 $30,600 Not Implemented
MZ0027 # 06 Y:2008 06 2008 HEAT WATER WITH EXHAUST HEAT $9,936 $10,000 Not Implemented
MZ0022 # 01 Y:2008 01 2008 RE-SIZE CHARGING OPENINGS OR ADD A MOVABLE DOOR ON EQUIPMENT $1,425 $2,800 Implemented