IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

28

matching recommendations
Reset
NAICS 332322 Sheet Metal Work Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MZ0251 # 02 Y:2018 02 2018 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $688 $75 Implemented
MZ0251 # 03 Y:2018 03 2018 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $862 $1,160 Implemented
MZ0251 # 04 Y:2018 04 2018 REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT $6,719 $36,000 Not Implemented
MZ0251 # 05 Y:2018 05 2018 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,018 $0 Implemented
MZ0251 # 06 Y:2018 06 2018 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $10,153 $6,140 Implemented
MZ0251 # 01 Y:2018 01 2018 RECOVERY METALS FROM RINSE WATER(EVAP., ION EXCHANGE, RO, ELECTROLYSIS, ELECTRODIALYSIS) AND REUSE RINSE WATER $22,536 $32,400 Not Implemented
UD0980 # 08 Y:2018 08 2018 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,597 $500 Not Implemented
UD0980 # 12 Y:2018 12 2018 INSTALL OCCUPANCY SENSORS $1,285 $700 Not Implemented
UD0980 # 11 Y:2018 11 2018 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $5,108 $0 Not Implemented
UD0980 # 10 Y:2018 10 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $61,867 $133,500 Not Implemented
UD0980 # 09 Y:2018 09 2018 REDUCE VENTILATION AIR $5,494 $3,000 Not Implemented
UD0980 # 07 Y:2018 07 2018 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $3,657 $3,000 Not Implemented
UD0980 # 06 Y:2018 06 2018 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $6,210 $0 Not Implemented
UD0980 # 05 Y:2018 05 2018 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $10,759 $1,000 Not Implemented
UD0980 # 04 Y:2018 04 2018 COMBINE UTILITY METERS $123,816 $0 Not Implemented
UD0980 # 03 Y:2018 03 2018 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $6,705 $0 Not Implemented
UD0980 # 02 Y:2018 02 2018 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $10,299 $0 Not Implemented
UD0980 # 01 Y:2018 01 2018 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $15,954 $0 Not Implemented
WM0116 # 01 Y:2018 01 2018 USE SOLAR HEAT TO MAKE ELECTRICTY $14,609 $72,000 Not Implemented
WM0116 # 02 Y:2018 02 2018 USE PHOTOCELL CONTROLS $3,191 $10,230 Not Implemented
WM0116 # 03 Y:2018 03 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,895 $14,722 Implemented
WM0116 # 04 Y:2018 04 2018 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $7,112 $14,000 Not Implemented
WM0116 # 05 Y:2018 05 2018 USE COUNTER CURRENT RINSING TO REDUCE WASTE WATER $3,017 $3,000 Not Implemented
WM0116 # 06 Y:2018 06 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,729 $1,833 Implemented
WM0116 # 07 Y:2018 07 2018 REPAIR OR REPLACE STEAM TRAPS $1,678 $3,960 Implemented