Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
22
matching recommendationsNAICS | 3324 | Boiler, Tank, and Shipping Container Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
IC0240 # 06 Y:2020 | 06 | 2020 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $9,057 | $4,858 | Not Implemented |
IC0240 # 05 Y:2020 | 05 | 2020 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $5,653 | $5,000 | Implemented |
IC0240 # 04 Y:2020 | 04 | 2020 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $16,845 | $0 | Implemented |
IC0240 # 03 Y:2020 | 03 | 2020 | OPTIMIZE PLANT POWER FACTOR | $30,912 | $18,940 | Implemented |
IC0240 # 02 Y:2020 | 02 | 2020 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $260 | $444 | Implemented |
IC0240 # 01 Y:2020 | 01 | 2020 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $47,834 | $36,263 | Implemented |
IC0230 # 02 Y:2020 | 02 | 2020 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $7,781 | $13,282 | Not Implemented |
IC0230 # 06 Y:2020 | 06 | 2020 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $45,814 | $7,700 | Not Implemented |
IC0230 # 05 Y:2020 | 05 | 2020 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $212,444 | $108,320 | Implemented |
IC0230 # 04 Y:2020 | 04 | 2020 | RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS | $15,197 | $0 | Not Implemented |
IC0230 # 03 Y:2020 | 03 | 2020 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $8,524 | $50 | Implemented |
IC0230 # 01 Y:2020 | 01 | 2020 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $5,837 | $1,500 | Not Implemented |
UM0266 # 01 Y:2004 | 01 | 2004 | USE FLUE GASES TO HEAT PROCESS OR SERVICE WATER | $11,825 | $4,500 | Implemented |
UM0266 # 02 Y:2004 | 02 | 2004 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $6,131 | $7,512 | Implemented |
UM0266 # 03 Y:2004 | 03 | 2004 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $5,042 | $900 | Implemented |
UM0266 # 04 Y:2004 | 04 | 2004 | RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR | $2,182 | $1,000 | Not Implemented |
UM0266 # 05 Y:2004 | 05 | 2004 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $1,847 | $2,000 | Implemented |
UM0266 # 06 Y:2004 | 06 | 2004 | CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS | $1,400 | $700 | Not Implemented |
UM0266 # 07 Y:2004 | 07 | 2004 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $1,312 | $3,500 | Not Implemented |
UM0266 # 08 Y:2004 | 08 | 2004 | REVISE SMOKE CLEANUP FROM OPERATIONS | $1,614 | $500 | Implemented |
UM0266 # 09 Y:2004 | 09 | 2004 | INSTALL OCCUPANCY SENSORS | $1,195 | $603 | Not Implemented |
UM0266 # 10 Y:2004 | 10 | 2004 | USE DOUBLE OR TRIPLE GLAZED WINDOWS TO MAINTAIN HIGHER RELATIVE HUMIDITY AND TO REDUCE HEAT LOSSES | $666 | $610 | Implemented |