IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

25

matching recommendations
Reset
NAICS 3324 Boiler, Tank, and Shipping Container Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UM0462 # 06 Y:2015 06 2015 INSTALL OCCUPANCY SENSORS $2,455 $4,800 Not Implemented
UM0462 # 05 Y:2015 05 2015 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $4,224 $1,000 Not Implemented
UM0462 # 04 Y:2015 04 2015 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $17,638 $4,500 Not Implemented
UM0462 # 03 Y:2015 03 2015 RECOVER WASTE HEAT FROM EQUIPMENT $23,500 $8,000 Not Implemented
UM0462 # 02 Y:2015 02 2015 HEAT WATER WITH EXHAUST HEAT $16,361 $20,000 Not Implemented
UM0462 # 01 Y:2015 01 2015 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $3,802 $7,405 Not Implemented
UM0419 # 03 Y:2013 03 2013 USE FLUE GASES IN RADIANT HEATER FOR SPACE HEATING, OVENS, ETC $9,991 $0 Not Implemented
UM0419 # 02 Y:2013 02 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,967 $4,350 Not Implemented
UM0419 # 01 Y:2013 01 2013 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,593 $200 Not Implemented
UM0415 # 03 Y:2012 03 2012 OPTIMIZE PLANT POWER FACTOR $12,081 $20,000 Not Implemented
UM0415 # 06 Y:2012 06 2012 INSULATE BARE EQUIPMENT $1,697 $1,500 Not Implemented
UM0415 # 05 Y:2012 05 2012 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $23,600 $1,000 Implemented
UM0415 # 04 Y:2012 04 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,832 $10,965 Not Implemented
UM0415 # 02 Y:2012 02 2012 INSTALL OCCUPANCY SENSORS $822 $875 Implemented
UM0415 # 01 Y:2012 01 2012 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $8,072 $4,000 Not Implemented
IC0163 # 01 Y:2009 01 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $528 $332 Implemented
IC0163 # 10 Y:2009 10 2009 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $1,689,703 $0 Implemented
IC0163 # 09 Y:2009 09 2009 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $260 $0 Not Implemented
IC0163 # 08 Y:2009 08 2009 RECYCLE WHITE WATER $2,034 $771 Implemented
IC0163 # 07 Y:2009 07 2009 PREHEAT COMBUSTION AIR WITH WASTE HEAT $6,925 $17,000 Implemented
IC0163 # 06 Y:2009 06 2009 USE RADIANT HEATER FOR SPOT HEATING $9,226 $39,560 Not Implemented
IC0163 # 05 Y:2009 05 2009 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $2,247 $0 Not Implemented
IC0163 # 04 Y:2009 04 2009 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $357 $0 Not Implemented
IC0163 # 03 Y:2009 03 2009 RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR $3,314 $102 Implemented
IC0163 # 02 Y:2009 02 2009 INSTALL OCCUPANCY SENSORS $635 $538 Implemented