Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
30
matching recommendationsNAICS | 3324 | Boiler, Tank, and Shipping Container Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
TT0300 # 02 Y:2023 | 02 | 2023 | BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE | $41,095 | $32,000 | n/a |
TT0300 # 03 Y:2023 | 03 | 2023 | OPTIMIZE PLANT POWER FACTOR | $22,385 | $37,500 | n/a |
TT0300 # 04 Y:2023 | 04 | 2023 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $20,075 | $30,000 | n/a |
TT0300 # 05 Y:2023 | 05 | 2023 | RECOVER WASTE HEAT FROM EQUIPMENT | $18,281 | $13,000 | n/a |
TT0300 # 06 Y:2023 | 06 | 2023 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $14,078 | $18,500 | n/a |
TT0300 # 07 Y:2023 | 07 | 2023 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $12,049 | $13,500 | n/a |
TT0300 # 08 Y:2023 | 08 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $10,614 | $19,910 | n/a |
TT0300 # 09 Y:2023 | 09 | 2023 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $8,809 | $156 | n/a |
TT0300 # 10 Y:2023 | 10 | 2023 | UPGRADE CONTROLS ON COMPRESSORS | $8,509 | $17,500 | n/a |
TT0300 # 11 Y:2023 | 11 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,868 | $1,965 | n/a |
TT0300 # 01 Y:2023 | 01 | 2023 | USE SOLAR HEAT TO MAKE ELECTRICTY | $46,047 | $221,715 | n/a |
TT0183 # 03 Y:2017 | 03 | 2017 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $11,488 | $5,100 | Implemented |
TT0183 # 02 Y:2017 | 02 | 2017 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $13,441 | $7,000 | Implemented |
TT0183 # 01 Y:2017 | 01 | 2017 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $22,849 | $30,000 | Not Implemented |
TT0183 # 04 Y:2017 | 04 | 2017 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $7,005 | $24,492 | Not Implemented |
TT0183 # 05 Y:2017 | 05 | 2017 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $2,947 | $1,400 | Not Implemented |
TT0183 # 06 Y:2017 | 06 | 2017 | AVOID COOLING OF PROCESS STREAMS OR MATERIALS THAT MUST SUBSEQUENTLY BE HEATED | $2,782 | $7,000 | Not Implemented |
TT0183 # 07 Y:2017 | 07 | 2017 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $1,424 | $125 | Implemented |
TT0157 # 07 Y:2015 | 07 | 2015 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $25,293 | $3,465 | Implemented |
TT0157 # 08 Y:2015 | 08 | 2015 | CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD | $26,456 | $157,989 | Implemented |
TT0157 # 09 Y:2015 | 09 | 2015 | UPGRADE CONTROLS ON COMPRESSORS | $26,246 | $2,400 | Implemented |
TT0157 # 10 Y:2015 | 10 | 2015 | REDUCE COMBUSTION AIR FLOW TO OPTIMUM | $2,978 | $1,000 | Not Implemented |
TT0157 # 04 Y:2015 | 04 | 2015 | USE OPTIMUM THICKNESS INSULATION | $32,011 | $40,000 | Not Implemented |
TT0157 # 03 Y:2015 | 03 | 2015 | UPGRADE CONTROLS ON COMPRESSORS | $32,298 | $15,201 | Implemented |
TT0157 # 02 Y:2015 | 02 | 2015 | RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS | $39,567 | $0 | Implemented |