Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
202
matching recommendationsNAICS | 33242 | Metal Tank (Heavy Gauge) Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
AS0564 # 07 Y:2023 | 07 | 2023 | ELIMINATE LEAKS IN WATER LINES AND VALVES | $29 | $79 | n/a |
AS0564 # 06 Y:2023 | 06 | 2023 | INSTALL HEAT PIPES / RAISE COOLING SETPOINT | $463 | $71 | n/a |
AS0564 # 05 Y:2023 | 05 | 2023 | INSTALL OCCUPANCY SENSORS | $945 | $110 | n/a |
AS0564 # 04 Y:2023 | 04 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,251 | $143 | n/a |
AS0564 # 03 Y:2023 | 03 | 2023 | USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE | $2,752 | $63 | n/a |
AS0564 # 02 Y:2023 | 02 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,294 | $1,654 | n/a |
AS0564 # 01 Y:2023 | 01 | 2023 | USE SOLAR HEAT TO MAKE ELECTRICTY | $30,388 | $182,064 | n/a |
DL0197 # 09 Y:2021 | 09 | 2021 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $23,313 | $39,529 | Implemented |
DL0197 # 07 Y:2021 | 07 | 2021 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,810 | $1,098 | Not Implemented |
DL0197 # 08 Y:2021 | 08 | 2021 | REPLACE BOILER | $8,560 | $23,609 | Not Implemented |
DL0197 # 03 Y:2021 | 03 | 2021 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $9,710 | $0 | Implemented |
DL0197 # 05 Y:2021 | 05 | 2021 | RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR | $2,034 | $1,300 | Implemented |
DL0197 # 06 Y:2021 | 06 | 2021 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $12,960 | $173,544 | Implemented |
DL0197 # 10 Y:2021 | 10 | 2021 | INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS | $1,950 | $9,070 | Not Implemented |
DL0197 # 11 Y:2021 | 11 | 2021 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $4,320 | $14,125 | Not Implemented |
DL0197 # 02 Y:2021 | 02 | 2021 | ADD AREA LIGHTING SWITCHES | $21,520 | $846 | Not Implemented |
DL0197 # 04 Y:2021 | 04 | 2021 | INSTALL TIMERS AND/OR THERMOSTATS | $730 | $135 | Implemented |
DL0197 # 01 Y:2021 | 01 | 2021 | USE OPTIMUM TEMPERATURE | $8,560 | $0 | Not Implemented |
LS2117 # 03 Y:2021 | 03 | 2021 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $8,638 | $675 | Implemented |
LS2117 # 06 Y:2021 | 06 | 2021 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $12,700 | $4,332 | Implemented |
LS2117 # 01 Y:2021 | 01 | 2021 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $4,901 | $25 | Not Implemented |
LS2117 # 02 Y:2021 | 02 | 2021 | INSTALL TIMERS AND/OR THERMOSTATS | $1,670 | $75 | Implemented |
LS2117 # 04 Y:2021 | 04 | 2021 | MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED | $1,552 | $300 | Implemented |
LS2117 # 05 Y:2021 | 05 | 2021 | INSTALL OCCUPANCY SENSORS | $504 | $100 | Implemented |
LS2117 # 07 Y:2021 | 07 | 2021 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $79,003 | $63,000 | Implemented |