IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

205

matching recommendations
Reset
NAICS 332420 Metal Tank (Heavy Gauge) Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
NC0514 # 01 Y:2014 01 2014 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $23,503 $100 Implemented
NC0514 # 02 Y:2014 02 2014 RECOVER WASTE HEAT FROM EQUIPMENT $13,824 $50,000 Not Implemented
NC0514 # 03 Y:2014 03 2014 RECOVER WASTE HEAT FROM EQUIPMENT $4,388 $5,250 Not Implemented
NC0514 # 04 Y:2014 04 2014 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $3,509 $10,000 Not Implemented
NC0514 # 05 Y:2014 05 2014 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,436 $50 Implemented
NC0514 # 06 Y:2014 06 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,983 $100 Implemented
NC0514 # 07 Y:2014 07 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,002 $7,540 Implemented
NC0514 # 08 Y:2014 08 2014 INSTALL OCCUPANCY SENSORS $3,435 $868 Implemented
NC0514 # 09 Y:2014 09 2014 SUBSTITUTE COMPRESSED AIR COOLING WITH WATER OR AIR COOLING $1,213 $1,017 Not Implemented
NC0514 # 10 Y:2014 10 2014 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $1,110 $200 Implemented
OK0874 # 01 Y:2014 01 2014 CLEAN AND MAINTAIN REFRIGERANT CONDENSERS AND TOWERS $380 $112 Implemented
OK0874 # 02 Y:2014 02 2014 ESTABLISH EQUIPMENT MAINTENANCE SCHEDULE $3,364 $1,568 Implemented
OK0874 # 03 Y:2014 03 2014 RECOVER WASTE HEAT FROM EQUIPMENT $1,682 $0 Implemented
OK0874 # 04 Y:2014 04 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $13,847 $980 Implemented
OK0874 # 05 Y:2014 05 2014 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $12,899 $21,005 Not Implemented
OK0874 # 06 Y:2014 06 2014 MAINTAIN AIR FILTERS BY CLEANING OR REPLACEMENT $934 $1,024 Implemented
MZ0134 # 01 Y:2013 01 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $53,250 $61,965 Implemented
MZ0134 # 02 Y:2013 02 2013 INSTALL OCCUPANCY SENSORS $22,321 $12,640 Not Implemented
MZ0134 # 03 Y:2013 03 2013 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $10,044 $2,500 Implemented
MZ0134 # 04 Y:2013 04 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,322 $1,333 Not Implemented
MZ0134 # 05 Y:2013 05 2013 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $5,688 $16,575 Not Implemented
MZ0134 # 06 Y:2013 06 2013 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $4,932 $2,000 Not Implemented
MZ0134 # 07 Y:2013 07 2013 INSULATE BARE EQUIPMENT $2,852 $1,614 Not Implemented
OK0848 # 01 Y:2013 01 2013 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $20,741 $0 Not Implemented
OK0848 # 02 Y:2013 02 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,100 $4,500 Implemented