IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

682

matching recommendations
Reset
NAICS 33243 Metal Can, Box, and Other Metal Container (Light Gauge) Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MZ0238 # 04 Y:2017 04 2017 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,489 $0 Implemented
MZ0238 # 05 Y:2017 05 2017 USE COMPRESSOR AIR FILTERS $413 $300 Implemented
MZ0238 # 06 Y:2017 06 2017 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,215 $1,160 Not Implemented
MZ0238 # 07 Y:2017 07 2017 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $536 $50 Implemented
MZ0238 # 08 Y:2017 08 2017 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $14 $0 Implemented
MZ0229 # 01 Y:2017 01 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $20,644 $27,718 Not Implemented
MZ0229 # 02 Y:2017 02 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $23,200 $112,088 Not Implemented
MZ0229 # 03 Y:2017 03 2017 INSTALL SPECTRAL REFLECTORS / DELAMP $6,600 $1,357 Not Implemented
MZ0229 # 04 Y:2017 04 2017 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $790 $0 Not Implemented
MZ0229 # 05 Y:2017 05 2017 RECOVER WASTE HEAT FROM EQUIPMENT $5,119 $550 Not Implemented
MZ0229 # 06 Y:2017 06 2017 REPLACE BOILER $183,230 $38,385 Not Implemented
MZ0229 # 07 Y:2017 07 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,499 $10,775 Not Implemented
MZ0229 # 08 Y:2017 08 2017 INSTALL OCCUPANCY SENSORS $1,053 $420 Not Implemented
MZ0229 # 09 Y:2017 09 2017 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,449 $50 Not Implemented
MZ0229 # 10 Y:2017 10 2017 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $33,300 $150,000 Not Implemented
TT0183 # 01 Y:2017 01 2017 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $22,849 $30,000 Not Implemented
TT0183 # 02 Y:2017 02 2017 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $13,441 $7,000 Implemented
TT0183 # 03 Y:2017 03 2017 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $11,488 $5,100 Implemented
TT0183 # 04 Y:2017 04 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,005 $24,492 Not Implemented
TT0183 # 05 Y:2017 05 2017 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $2,947 $1,400 Not Implemented
TT0183 # 06 Y:2017 06 2017 AVOID COOLING OF PROCESS STREAMS OR MATERIALS THAT MUST SUBSEQUENTLY BE HEATED $2,782 $7,000 Not Implemented
TT0183 # 07 Y:2017 07 2017 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,424 $125 Implemented
MA0752 # 01 Y:2015 01 2015 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $87,976 $186,150 Not Implemented
MA0752 # 02 Y:2015 02 2015 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $45,566 $37,930 Implemented
MA0752 # 03 Y:2015 03 2015 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $37,599 $47,900 Implemented