Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
37
matching recommendationsNAICS | 33243 | Metal Can, Box, and Other Metal Container (Light Gauge) Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
LE0369 # 02 Y:2013 | 02 | 2013 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,100 | $14,365 | Implemented |
LE0369 # 03 Y:2013 | 03 | 2013 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,867 | $8,710 | Not Implemented |
LE0369 # 04 Y:2013 | 04 | 2013 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,258 | $7,350 | Implemented |
LE0369 # 05 Y:2013 | 05 | 2013 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $50,065 | $1,470 | Implemented |
LE0369 # 06 Y:2013 | 06 | 2013 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $50,836 | $87,600 | Implemented |
LE0369 # 07 Y:2013 | 07 | 2013 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,083 | $1,000 | Implemented |
LE0369 # 08 Y:2013 | 08 | 2013 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $18,023 | $32,025 | Implemented |
LE0369 # 01 Y:2013 | 01 | 2013 | INSTALL OCCUPANCY SENSORS | $8,050 | $19,339 | Implemented |
NC0491 # 02 Y:2013 | 02 | 2013 | REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT | $5,220 | $31,024 | Not Implemented |
NC0491 # 05 Y:2013 | 05 | 2013 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,248 | $11,314 | Implemented |
NC0491 # 06 Y:2013 | 06 | 2013 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $576 | $100 | Implemented |
NC0491 # 01 Y:2013 | 01 | 2013 | USE FLUE GASES TO HEAT PROCESS OR SERVICE WATER | $13,288 | $25,000 | Not Implemented |
NC0491 # 04 Y:2013 | 04 | 2013 | USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING | $2,591 | $10,980 | Not Implemented |
NC0491 # 03 Y:2013 | 03 | 2013 | RECOVER WASTE HEAT FROM EQUIPMENT | $2,560 | $4,950 | Not Implemented |
BD0429 # 06 Y:2013 | 06 | 2013 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $354 | $440 | Not Implemented |
BD0429 # 05 Y:2013 | 05 | 2013 | ADJUST / MAINTAIN FORK LIFT TRUCKS FOR MOST EFFICIENT OPERATION | $651 | $2,300 | Not Implemented |
BD0429 # 01 Y:2013 | 01 | 2013 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $12,975 | $200 | Implemented |
BD0429 # 02 Y:2013 | 02 | 2013 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,306 | $5,680 | Not Implemented |
BD0429 # 03 Y:2013 | 03 | 2013 | RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS | $1,152 | $30 | Not Implemented |
BD0429 # 04 Y:2013 | 04 | 2013 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $666 | $25 | Not Implemented |
BD0429 # 07 Y:2013 | 07 | 2013 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $226 | $700 | Not Implemented |
WV0471 # 06 Y:2013 | 06 | 2013 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,860 | $310 | Implemented |
WV0471 # 05 Y:2013 | 05 | 2013 | ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM | $5,088 | $1,000 | Implemented |
WV0471 # 04 Y:2013 | 04 | 2013 | COMBINE UTILITY METERS | $5,415 | $11,000 | Implemented |
WV0471 # 03 Y:2013 | 03 | 2013 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $6,454 | $6,210 | Not Implemented |