Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
453
matching recommendationsNAICS | 332431 | Metal Can Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MI0066 # 02 Y:2003 | 02 | 2003 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $643 | $636 | Not Implemented |
MI0066 # 03 Y:2003 | 03 | 2003 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,637 | $4,051 | Not Implemented |
MI0066 # 04 Y:2003 | 04 | 2003 | INSTALL OCCUPANCY SENSORS | $432 | $612 | Not Implemented |
MI0066 # 05 Y:2003 | 05 | 2003 | USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE | $1,238 | $60 | Implemented |
MI0066 # 06 Y:2003 | 06 | 2003 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $5,117 | $17,250 | Not Implemented |
MI0066 # 07 Y:2003 | 07 | 2003 | TURN OFF EQUIPMENT WHEN NOT IN USE | $1,490 | $175 | Not Implemented |
MI0066 # 08 Y:2003 | 08 | 2003 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $729 | $33 | Implemented |
MI0066 # 09 Y:2003 | 09 | 2003 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $217 | $220 | Implemented |
UD0679 # 01 Y:2003 | 01 | 2003 | REDUCE VENTILATION AIR | $241,706 | $-3,800,000 | n/a |
UD0679 # 02 Y:2003 | 02 | 2003 | USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING | $52,385 | $1,125 | n/a |
UD0679 # 03 Y:2003 | 03 | 2003 | METER RECYCLED WATER (TO REDUCE SEWER CHARGES) | $12,046 | $270 | n/a |
UD0679 # 04 Y:2003 | 04 | 2003 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $12,330 | $1,100 | n/a |
UD0679 # 05 Y:2003 | 05 | 2003 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $7,465 | $200 | n/a |
UD0679 # 06 Y:2003 | 06 | 2003 | UTILIZE A LESS EXPENSIVE COOLING METHOD | $7,398 | $0 | n/a |
UD0679 # 07 Y:2003 | 07 | 2003 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $6,070 | $7,100 | n/a |
UD0679 # 08 Y:2003 | 08 | 2003 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $5,200 | $1,750 | n/a |
UD0679 # 09 Y:2003 | 09 | 2003 | DISCONNECT BALLASTS | $3,797 | $132 | n/a |
UD0679 # 10 Y:2003 | 10 | 2003 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,739 | $3,618 | n/a |
UD0679 # 11 Y:2003 | 11 | 2003 | INSTALL OCCUPANCY SENSORS | $232 | $110 | n/a |
LE0167 # 01 Y:2003 | 01 | 2003 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $55,709 | $87,769 | Implemented |
LE0167 # 02 Y:2003 | 02 | 2003 | KEEP DOORS AND WINDOWS SHUT WHEN NOT ON USE | $13,957 | $0 | Not Implemented |
LE0167 # 03 Y:2003 | 03 | 2003 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $9,985 | $5,000 | Not Implemented |
LE0167 # 04 Y:2003 | 04 | 2003 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $8,304 | $4,000 | Not Implemented |
LE0167 # 05 Y:2003 | 05 | 2003 | INSULATE BARE EQUIPMENT | $5,770 | $985 | Not Implemented |
LE0167 # 06 Y:2003 | 06 | 2003 | USE SYNTHETIC LUBRICANT | $5,893 | $1,000 | Not Implemented |