IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

245

matching recommendations
Reset
NAICS 332439 Other Metal Container Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UA0237 # 01 Y:2021 01 2021 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $46,741 $78,276 Implemented
SD0595 # 04 Y:2020 04 2020 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $5,799 $8,000 Not Implemented
SD0595 # 06 Y:2020 06 2020 COVER OPEN TANKS $551 $818 Not Implemented
SD0595 # 02 Y:2020 02 2020 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $629 $0 Not Implemented
SD0595 # 01 Y:2020 01 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,029 $300 Not Implemented
SD0595 # 03 Y:2020 03 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $679 $1,983 Implemented
SD0595 # 05 Y:2020 05 2020 REPAIR AND ELIMINATE STEAM LEAKS $727 $600 Implemented
UK1915 # 01 Y:2019 01 2019 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,711 $2,510 n/a
UK1915 # 07 Y:2019 07 2019 OPTIMIZE PLANT POWER FACTOR $127,719 $54,495 n/a
UK1915 # 06 Y:2019 06 2019 INSULATE BARE EQUIPMENT $13,534 $26,305 n/a
UK1915 # 05 Y:2019 05 2019 REPLACE TREATED WATER WITH WELL / SURFACE WATER $53,903 $10,200 n/a
UK1915 # 04 Y:2019 04 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $19,983 $21,695 n/a
UK1915 # 03 Y:2019 03 2019 INSTALL OCCUPANCY SENSORS $259 $260 n/a
UK1915 # 02 Y:2019 02 2019 RE-SIZE CHARGING OPENINGS OR ADD A MOVABLE DOOR ON EQUIPMENT $7,951 $17,032 n/a
IA0546 # 06 Y:2015 06 2015 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $419 $539 Implemented
IA0546 # 07 Y:2015 07 2015 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $229 $371 Implemented
IA0546 # 04 Y:2015 04 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,230 $463 Implemented
IA0546 # 03 Y:2015 03 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,451 $5,839 Implemented
IA0546 # 05 Y:2015 05 2015 SHUT OFF PILOTS IN STANDBY EQUIPMENT $814 $60 Implemented
IA0546 # 02 Y:2015 02 2015 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,907 $7,104 Implemented
IA0546 # 01 Y:2015 01 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,361 $6,263 Implemented
UM0462 # 06 Y:2015 06 2015 INSTALL OCCUPANCY SENSORS $2,455 $4,800 Not Implemented
UM0462 # 01 Y:2015 01 2015 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $3,802 $7,405 Not Implemented
UM0462 # 03 Y:2015 03 2015 RECOVER WASTE HEAT FROM EQUIPMENT $23,500 $8,000 Not Implemented
UM0462 # 04 Y:2015 04 2015 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $17,638 $4,500 Not Implemented