Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
167
matching recommendationsNAICS | 3325 | Hardware Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
SD0636 # 07 Y:2023 | 07 | 2023 | CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE | $473 | $0 | Not Implemented |
SD0636 # 09 Y:2023 | 09 | 2023 | USE BATTERY STORAGE FOR DEMAND CONTROL | $72,872 | $0 | Not Implemented |
SD0636 # 02 Y:2023 | 02 | 2023 | SHIFT FROM DAYTIME TO NIGHTTIME OPERATION | $28,974 | $0 | Not Implemented |
SD0636 # 04 Y:2023 | 04 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $6,654 | $4,172 | Implemented |
SD0636 # 01 Y:2023 | 01 | 2023 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,805 | $300 | Not Implemented |
SD0636 # 06 Y:2023 | 06 | 2023 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $24,771 | $37,377 | Not Implemented |
SD0636 # 08 Y:2023 | 08 | 2023 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $20,560 | $30,577 | Not Implemented |
SD0636 # 03 Y:2023 | 03 | 2023 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $2,227 | $4,339 | Not Implemented |
SD0636 # 05 Y:2023 | 05 | 2023 | USE SOLAR HEAT TO MAKE ELECTRICTY | $111,629 | $154,568 | Not Implemented |
KS2209 # 06 Y:2022 | 06 | 2022 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $8,163 | $34,256 | Implemented |
KS2209 # 07 Y:2022 | 07 | 2022 | USE SOLAR HEAT TO MAKE ELECTRICTY | $77,094 | $526,518 | Implemented |
KS2209 # 08 Y:2022 | 08 | 2022 | USE WASTE HEAT WITH A CLOSED-CYCLE GAS TURBINE-GENERATOR SET TO COGENERATE ELECTRICITY AND HEAT | $79,738 | $627,000 | Not Implemented |
KS2209 # 02 Y:2022 | 02 | 2022 | PAY UTILITY BILLS ON TIME | $593 | $0 | Implemented |
KS2209 # 03 Y:2022 | 03 | 2022 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $12,552 | $5,960 | Not Implemented |
KS2209 # 04 Y:2022 | 04 | 2022 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $4,315 | $60 | Not Implemented |
KS2209 # 01 Y:2022 | 01 | 2022 | APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES | $24,875 | $1,600 | Implemented |
KS2209 # 05 Y:2022 | 05 | 2022 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $2,610 | $1,085 | Not Implemented |
CW0123 # 10 Y:2022 | 10 | 2022 | USE POWER DURING OFF-PEAK PERIODS | $1,949 | $0 | n/a |
CW0123 # 07 Y:2022 | 07 | 2022 | REDUCE COMBUSTION AIR FLOW TO OPTIMUM | $30,793 | $45,000 | n/a |
CW0123 # 06 Y:2022 | 06 | 2022 | SCHEDULE BAKING TIMES OF SMALL AND LARGE COMPONENTS | $2,357 | $0 | n/a |
CW0123 # 05 Y:2022 | 05 | 2022 | USE OPTIMUM TEMPERATURE | $4,521 | $3,500 | n/a |
CW0123 # 04 Y:2022 | 04 | 2022 | IMPROVE LUBRICATION PRACTICES | $27,999 | $8,008 | n/a |
CW0123 # 03 Y:2022 | 03 | 2022 | REPLACE HEXAVALENT CHROMIUM SOLUTIONS WITH TRIVALENT SOLUTIONS | $30,091 | $55,770 | n/a |
CW0123 # 02 Y:2022 | 02 | 2022 | USE PRECIPITATING AGENTS IN WASTE WATER TREATMENT THAT PRODUCE THE LEAST QUANTITY OF WASTE | $1,422 | $4,000 | n/a |
CW0123 # 01 Y:2022 | 01 | 2022 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $518 | $105 | n/a |