Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
24
matching recommendationsNAICS | 3325 | Hardware Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UM0280 # 10 Y:2005 | 10 | 2005 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $208 | $105 | Not Implemented |
UM0280 # 09 Y:2005 | 09 | 2005 | RECOVER WASTE HEAT FROM EQUIPMENT | $397 | $1,000 | Not Implemented |
UM0280 # 08 Y:2005 | 08 | 2005 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $654 | $225 | Implemented |
UM0280 # 07 Y:2005 | 07 | 2005 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $897 | $750 | Implemented |
UM0280 # 06 Y:2005 | 06 | 2005 | INSTALL OCCUPANCY SENSORS | $1,470 | $484 | Implemented |
UM0280 # 05 Y:2005 | 05 | 2005 | INSULATE BARE EQUIPMENT | $2,086 | $128 | Implemented |
UM0280 # 04 Y:2005 | 04 | 2005 | USE WASTE HEAT FROM FLUE GASES TO HEAT SPACE CONDITIONING AIR | $2,274 | $1,680 | Not Implemented |
UM0280 # 03 Y:2005 | 03 | 2005 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $4,277 | $35 | Implemented |
UM0280 # 02 Y:2005 | 02 | 2005 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $18,174 | $11,550 | Not Implemented |
UM0280 # 01 Y:2005 | 01 | 2005 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $20,334 | $24,499 | Not Implemented |
GT0784 # 02 Y:2004 | 02 | 2004 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $4,015 | $1,782 | Not Implemented |
GT0784 # 10 Y:2004 | 10 | 2004 | CONTROL PRESSURE ON STEAMER OPERATIONS | $14,204 | $29,000 | Not Implemented |
GT0784 # 09 Y:2004 | 09 | 2004 | REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES | $3,685 | $4,550 | Not Implemented |
GT0784 # 08 Y:2004 | 08 | 2004 | METER WASTE WATER | $4,010 | $1,100 | Implemented |
GT0784 # 07 Y:2004 | 07 | 2004 | MINIMIZE WATER USAGE | $7,400 | $1,840 | Implemented |
GT0784 # 06 Y:2004 | 06 | 2004 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $40,320 | $5,000 | Not Implemented |
GT0784 # 05 Y:2004 | 05 | 2004 | USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY | $51,264 | $0 | Not Implemented |
GT0784 # 04 Y:2004 | 04 | 2004 | REPLACE THE CHLORINATION STAGE WITH AN OXYGEN OR OZONE STAGE | $14,255 | $35,020 | Not Implemented |
GT0784 # 03 Y:2004 | 03 | 2004 | ADJUST BURNERS FOR EFFICIENT OPERATION | $20,500 | $1,200 | Implemented |
GT0784 # 01 Y:2004 | 01 | 2004 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $18,866 | $1,000 | Implemented |
OR0454 # 02 Y:2004 | 02 | 2004 | INSTALL SENSORS TO DETECT DEFECTS | $24,900 | $2,600 | Not Implemented |
OR0454 # 03 Y:2004 | 03 | 2004 | ELIMINATE OLD STOCK AND MODIFY INVENTORY CONTROL | $5,720 | $13,080 | Implemented |
OR0454 # 04 Y:2004 | 04 | 2004 | USE WATER-BASED CUTTING FLUIDS TO ELIMINATE NEED FOR SOLVENT CLEANING | $16,940 | $29,200 | Implemented |
OR0454 # 01 Y:2004 | 01 | 2004 | REDESIGN PROCESS | $39,560 | $0 | Not Implemented |