Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
89
matching recommendationsNAICS | 33251 | Hardware Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UU0267 # 06 Y:2025 | 06 | 2025 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $3,113 | $29,674 | n/a |
UU0267 # 08 Y:2025 | 08 | 2025 | USE MAGNETIC TECHNOLOGY TO TREAT WATER | $12,294 | $19,900 | n/a |
UU0267 # 04 Y:2025 | 04 | 2025 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $2,650 | $9,727 | n/a |
UU0267 # 01 Y:2025 | 01 | 2025 | OPTIMIZE PLANT POWER FACTOR | $3,730 | $6,750 | n/a |
UU0267 # 02 Y:2025 | 02 | 2025 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $2,200 | $6,000 | n/a |
UU0267 # 07 Y:2025 | 07 | 2025 | USE AUTOMATIC FLOW CONTROL | $2,903 | $6,218 | n/a |
UU0267 # 03 Y:2025 | 03 | 2025 | USE COOLING TOWER WATER INSTEAD OF REFRIGERATION | $6,322 | $119,100 | n/a |
UU0267 # 05 Y:2025 | 05 | 2025 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,456 | $3,600 | n/a |
MZ0365 # 05 Y:2024 | 05 | 2024 | REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL | $267,134 | $875,396 | n/a |
MZ0365 # 03 Y:2024 | 03 | 2024 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $3,741 | $805 | n/a |
MZ0365 # 06 Y:2024 | 06 | 2024 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $10,036 | $6,500 | n/a |
MZ0365 # 01 Y:2024 | 01 | 2024 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $6,949 | $1,000 | n/a |
MZ0365 # 04 Y:2024 | 04 | 2024 | MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED | $96 | $520 | n/a |
MZ0365 # 02 Y:2024 | 02 | 2024 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $17,558 | $75,320 | n/a |
UC2403 # 06 Y:2024 | 06 | 2024 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $1,576 | $50 | Implemented |
UC2403 # 02 Y:2024 | 02 | 2024 | PAY UTILITY BILLS ON TIME | $64 | $0 | Implemented |
UC2403 # 07 Y:2024 | 07 | 2024 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $753 | $2,612 | Not Implemented |
UC2403 # 05 Y:2024 | 05 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $5,880 | $1,300 | Implemented |
UC2403 # 09 Y:2024 | 09 | 2024 | USE SOLAR HEAT TO MAKE ELECTRICTY | $49,517 | $311,208 | Not Implemented |
UC2403 # 08 Y:2024 | 08 | 2024 | INSTALL TIMERS AND/OR THERMOSTATS | $1,116 | $333 | Implemented |
UC2403 # 04 Y:2024 | 04 | 2024 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $2,103 | $428 | Not Implemented |
UC2403 # 03 Y:2024 | 03 | 2024 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,934 | $0 | Implemented |
UC2403 # 01 Y:2024 | 01 | 2024 | APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES | $4,885 | $0 | Implemented |
SD0636 # 09 Y:2023 | 09 | 2023 | USE BATTERY STORAGE FOR DEMAND CONTROL | $72,872 | $0 | Not Implemented |
SD0636 # 08 Y:2023 | 08 | 2023 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $20,560 | $30,577 | Not Implemented |