Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
26
matching recommendationsNAICS | 33261 | Spring and Wire Product Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
WM0043 # 08 Y:2014 | 08 | 2014 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $435 | $1,138 | Implemented |
WM0043 # 07 Y:2014 | 07 | 2014 | INSTALL SPECTRAL REFLECTORS / DELAMP | $820 | $400 | Not Implemented |
WM0043 # 06 Y:2014 | 06 | 2014 | PAY UTILITY BILLS ON TIME | $211 | $0 | Implemented |
WM0043 # 05 Y:2014 | 05 | 2014 | USE SYNTHETIC LUBRICANT | $680 | $127 | Not Implemented |
WM0043 # 04 Y:2014 | 04 | 2014 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $3,039 | $4,600 | Not Implemented |
WM0043 # 03 Y:2014 | 03 | 2014 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $5,070 | $400 | Implemented |
WM0043 # 02 Y:2014 | 02 | 2014 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $2,588 | $0 | Implemented |
WM0043 # 01 Y:2014 | 01 | 2014 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $13,399 | $38,020 | Implemented |
WM0038 # 05 Y:2014 | 05 | 2014 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $637 | $1,519 | Implemented |
WM0038 # 09 Y:2014 | 09 | 2014 | TURN OFF EQUIPMENT WHEN NOT IN USE | $149 | $460 | Implemented |
WM0038 # 08 Y:2014 | 08 | 2014 | TURN OFF EQUIPMENT WHEN NOT IN USE | $1,319 | $0 | Not Implemented |
WM0038 # 07 Y:2014 | 07 | 2014 | USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE | $151 | $105 | Not Implemented |
WM0038 # 06 Y:2014 | 06 | 2014 | RECOVER WASTE HEAT FROM EQUIPMENT | $965 | $880 | Not Implemented |
WM0038 # 04 Y:2014 | 04 | 2014 | USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE | $622 | $500 | Implemented |
WM0038 # 03 Y:2014 | 03 | 2014 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $5,678 | $1,768 | Implemented |
WM0038 # 02 Y:2014 | 02 | 2014 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $172 | $73 | Implemented |
WM0038 # 01 Y:2014 | 01 | 2014 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,700 | $16,042 | Implemented |
WM0006 # 01 Y:2012 | 01 | 2012 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $444 | $0 | Not Implemented |
WM0006 # 09 Y:2012 | 09 | 2012 | IMPROVE SPACE COMFORT CONDITIONING | $6,854 | $884 | Not Implemented |
WM0006 # 08 Y:2012 | 08 | 2012 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $15,810 | $0 | Not Implemented |
WM0006 # 07 Y:2012 | 07 | 2012 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $341 | $0 | Not Implemented |
WM0006 # 06 Y:2012 | 06 | 2012 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $772 | $0 | Implemented |
WM0006 # 05 Y:2012 | 05 | 2012 | MAINTAIN AIR FILTERS BY CLEANING OR REPLACEMENT | $1,994 | $191 | Implemented |
WM0006 # 04 Y:2012 | 04 | 2012 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $22,037 | $0 | Implemented |
WM0006 # 03 Y:2012 | 03 | 2012 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $8,926 | $0 | Not Implemented |