Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
1,135
matching recommendationsNAICS | 3327 | Machine Shops; Turned Product; and Screw, Nut, and Bolt Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
DL0021 # 05 Y:2008 | 05 | 2008 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $4,560 | $0 | Not Implemented |
WV0380 # 01 Y:2008 | 01 | 2008 | OPTIMIZE PLANT POWER FACTOR | $18,045 | $7,420 | Not Implemented |
WV0380 # 02 Y:2008 | 02 | 2008 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $14,037 | $8,850 | Implemented |
WV0380 # 03 Y:2008 | 03 | 2008 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $7,429 | $3,300 | Not Implemented |
WV0380 # 04 Y:2008 | 04 | 2008 | DE-ENERGIZE EXCESS TRANSFORMER CAPACITY | $6,055 | $4,950 | Not Implemented |
WV0380 # 05 Y:2008 | 05 | 2008 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $5,310 | $0 | Implemented |
WV0380 # 06 Y:2008 | 06 | 2008 | RECOVER WASTE HEAT FROM EQUIPMENT | $4,106 | $1,120 | Not Implemented |
WV0380 # 07 Y:2008 | 07 | 2008 | ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM | $3,939 | $1,690 | Implemented |
WV0380 # 08 Y:2008 | 08 | 2008 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $3,853 | $13,200 | Not Implemented |
WV0380 # 09 Y:2008 | 09 | 2008 | DEVELOP A REPAIR/REPLACE POLICY | $2,626 | $1,018 | Implemented |
WV0380 # 10 Y:2008 | 10 | 2008 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,058 | $30 | Implemented |
WV0380 # 11 Y:2008 | 11 | 2008 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $1,989 | $1,550 | Implemented |
WV0380 # 12 Y:2008 | 12 | 2008 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,891 | $0 | Implemented |
WV0380 # 13 Y:2008 | 13 | 2008 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,422 | $225 | Not Implemented |
WV0380 # 14 Y:2008 | 14 | 2008 | USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER | $807 | $4,400 | Not Implemented |
LE0275 # 01 Y:2008 | 01 | 2008 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $22,241 | $20,000 | Not Implemented |
LE0275 # 02 Y:2008 | 02 | 2008 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $16,646 | $6,020 | Implemented |
LE0275 # 03 Y:2008 | 03 | 2008 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $12,225 | $1,800 | Implemented |
LE0275 # 04 Y:2008 | 04 | 2008 | USE RADIANT HEATER FOR SPOT HEATING | $9,912 | $5,250 | Not Implemented |
LE0275 # 05 Y:2008 | 05 | 2008 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $9,781 | $2,200 | Not Implemented |
LE0275 # 06 Y:2008 | 06 | 2008 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $6,675 | $1,000 | Implemented |
LE0275 # 07 Y:2008 | 07 | 2008 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $5,495 | $11,500 | Not Implemented |
LE0275 # 08 Y:2008 | 08 | 2008 | INSTALL OCCUPANCY SENSORS | $5,121 | $300 | Implemented |
LE0275 # 09 Y:2008 | 09 | 2008 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $2,949 | $4,000 | Not Implemented |
LE0275 # 10 Y:2008 | 10 | 2008 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,664 | $50 | Implemented |