IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,074

matching recommendations
Reset
NAICS 3327 Machine Shops; Turned Product; and Screw, Nut, and Bolt Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UC2303 # 04 Y:2023 04 2023 TURN OFF EQUIPMENT WHEN NOT IN USE $1,129 $500 Not Implemented
UC2303 # 05 Y:2023 05 2023 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT $16,066 $176,604 Not Implemented
UC2303 # 06 Y:2023 06 2023 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $6,257 $36,220 Not Implemented
UC2303 # 07 Y:2023 07 2023 USE SOLAR HEAT TO MAKE ELECTRICTY $47,312 $455,896 Not Implemented
UC2303 # 08 Y:2023 08 2023 USE HEAT PUMP FOR SPACE CONDITIONING $3,229 $13,224 Not Implemented
UC2303 # 09 Y:2023 09 2023 USE BATTERY STORAGE FOR DEMAND CONTROL $11,455 $55,867 Not Implemented
SJ0001 # 05 Y:2023 05 2023 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $2,785 $1,200 Not Implemented
SJ0001 # 04 Y:2023 04 2023 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $480 $0 Not Implemented
SJ0001 # 03 Y:2023 03 2023 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $6,541 $0 Not Implemented
SJ0001 # 02 Y:2023 02 2023 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,201 $0 Not Implemented
SJ0001 # 01 Y:2023 01 2023 USE SOLAR HEAT TO MAKE ELECTRICTY $58,845 $236,368 Not Implemented
LT8365 # 03 Y:2023 03 2023 REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT $8,434 $216,000 n/a
LT8365 # 02 Y:2023 02 2023 TURN OFF EQUIPMENT WHEN NOT IN USE $55,888 $0 n/a
LT8365 # 01 Y:2023 01 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,577 $1,300 n/a
AM0863 # 07 Y:2023 07 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $351 $0 Implemented
AM0863 # 06 Y:2023 06 2023 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $640 $1,235 Implemented
AM0863 # 05 Y:2023 05 2023 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $830 $38 Not Implemented
AM0863 # 04 Y:2023 04 2023 INSTALL OCCUPANCY SENSORS $1,005 $630 Not Implemented
AM0863 # 03 Y:2023 03 2023 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $56,316 $5,000 Implemented
AM0863 # 02 Y:2023 02 2023 OPTIMIZE PLANT POWER FACTOR $11,860 $23,400 Implemented
AM0863 # 01 Y:2023 01 2023 CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS $26,790 $0 Implemented
UW2213 # 03 Y:2022 03 2022 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $766 $380 Not Implemented
UW2213 # 02 Y:2022 02 2022 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $6,610 $0 Not Implemented
UW2213 # 01 Y:2022 01 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,539 $2,080 Not Implemented
SU0524 # 01 Y:2022 01 2022 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,266 $0 Not Implemented