IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

15

matching recommendations
Reset
NAICS 3327 Machine Shops; Turned Product; and Screw, Nut, and Bolt Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OR0697 # 01 Y:2018 01 2018 USE MAGNETIC TECHNOLOGY TO TREAT WATER $201,762 $50,000 Implemented
OR0697 # 02 Y:2018 02 2018 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $18,460 $45,600 Not Implemented
OR0697 # 03 Y:2018 03 2018 INSULATE BARE EQUIPMENT $25,653 $51,599 Implemented
OR0697 # 04 Y:2018 04 2018 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $19,381 $19,381 Not Implemented
OR0697 # 05 Y:2018 05 2018 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,725 $250 Implemented
OR0689 # 01 Y:2017 01 2017 PURCHASE NEW EQUIPMENT TO REDUCE MATERIAL USE / COST $12,509 $19,000 Implemented
OR0689 # 02 Y:2017 02 2017 PREVENT EXCESSIVE SOLVENT USAGE (OPERATOR TRAINING) $18,000 $1,495 Implemented
OR0689 # 03 Y:2017 03 2017 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,595 $5,595 Implemented
OR0689 # 04 Y:2017 04 2017 REDUCE VENTILATION AIR $3,492 $12,558 Not Implemented
OR0625 # 01 Y:2014 01 2014 TURN OFF EQUIPMENT WHEN NOT IN USE $11,654 $1,000 Not Implemented
OR0625 # 02 Y:2014 02 2014 UTILIZE A LESS EXPENSIVE COOLING METHOD $5,751 $5,908 Not Implemented
OR0625 # 03 Y:2014 03 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,834 $800 Not Implemented
OR0625 # 04 Y:2014 04 2014 USE SOLAR HEAT TO MAKE ELECTRICTY $5,889 $72,131 Not Implemented
OR0625 # 05 Y:2014 05 2014 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $5,528 $0 Not Implemented
OR0625 # 06 Y:2014 06 2014 REDUCE FLUID FLOW RATES $2,097 $5,600 Not Implemented