IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

632

matching recommendations
Reset
NAICS 33271 Machine Shops
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WV0364 # 06 Y:2007 06 2007 DEVELOP A REPAIR/REPLACE POLICY $12,941 $840 Implemented
WV0364 # 05 Y:2007 05 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $16,229 $40,317 Implemented
WV0364 # 04 Y:2007 04 2007 REPAIR FURNACES AND OVEN DOORS SO THAT THEY SEAL EFFICIENTLY $25,424 $32,700 Implemented
WV0364 # 03 Y:2007 03 2007 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $28,283 $0 Implemented
WV0364 # 02 Y:2007 02 2007 INSULATE BARE EQUIPMENT $29,507 $12,903 Implemented
WV0364 # 01 Y:2007 01 2007 USE DEMAND CONTROLLER OR LOAD SHEDDER $37,506 $7,700 Not Implemented
WI0516 # 01 Y:2006 01 2006 $987,800 $0 Not Implemented
WI0516 # 02 Y:2006 02 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $17,265 $33,480 Implemented
WI0516 # 03 Y:2006 03 2006 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $7,330 $1,600 Not Implemented
WI0516 # 04 Y:2006 04 2006 RECOVER WASTE HEAT FROM EQUIPMENT $5,311 $1,000 Implemented
WI0516 # 05 Y:2006 05 2006 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $2,187 $325 Not Implemented
WI0516 # 06 Y:2006 06 2006 INSTALL TIMERS AND/OR THERMOSTATS $1,556 $200 Not Implemented
WI0516 # 07 Y:2006 07 2006 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,352 $2,560 Implemented
WI0502 # 01 Y:2005 01 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $13,862 $27,000 Not Implemented
WI0502 # 02 Y:2005 02 2005 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $4,177 $9,500 Not Implemented
WI0502 # 03 Y:2005 03 2005 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $3,880 $0 Not Implemented
WI0502 # 04 Y:2005 04 2005 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $3,880 $0 Not Implemented
WI0502 # 05 Y:2005 05 2005 INSTALL TIMERS AND/OR THERMOSTATS $2,699 $0 Not Implemented
WI0502 # 06 Y:2005 06 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,919 $0 Not Implemented
WI0502 # 07 Y:2005 07 2005 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $2,670 $520 Not Implemented
WI0502 # 08 Y:2005 08 2005 IMPROVE LUBRICATION PRACTICES $1,579 $1,238 Not Implemented
WI0502 # 09 Y:2005 09 2005 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,524 $1,280 Not Implemented
WI0502 # 10 Y:2005 10 2005 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $1,374 $1,500 Not Implemented
TA0102 # 01 Y:2005 01 2005 USE POWER DURING OFF-PEAK PERIODS $20,445 $0 Implemented
TA0102 # 02 Y:2005 02 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,027 $110 Implemented