Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
648
matching recommendationsNAICS | 33271 | Machine Shops |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
WI0516 # 03 Y:2006 | 03 | 2006 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $7,330 | $1,600 | Not Implemented |
WI0516 # 04 Y:2006 | 04 | 2006 | RECOVER WASTE HEAT FROM EQUIPMENT | $5,311 | $1,000 | Implemented |
WI0516 # 05 Y:2006 | 05 | 2006 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $2,187 | $325 | Not Implemented |
WI0516 # 07 Y:2006 | 07 | 2006 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,352 | $2,560 | Implemented |
WI0502 # 10 Y:2005 | 10 | 2005 | REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED | $1,374 | $1,500 | Not Implemented |
WI0502 # 09 Y:2005 | 09 | 2005 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,524 | $1,280 | Not Implemented |
WI0502 # 01 Y:2005 | 01 | 2005 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $13,862 | $27,000 | Not Implemented |
WI0502 # 02 Y:2005 | 02 | 2005 | MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE | $4,177 | $9,500 | Not Implemented |
WI0502 # 03 Y:2005 | 03 | 2005 | INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS | $3,880 | $0 | Not Implemented |
WI0502 # 04 Y:2005 | 04 | 2005 | INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS | $3,880 | $0 | Not Implemented |
WI0502 # 05 Y:2005 | 05 | 2005 | INSTALL TIMERS AND/OR THERMOSTATS | $2,699 | $0 | Not Implemented |
WI0502 # 06 Y:2005 | 06 | 2005 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,919 | $0 | Not Implemented |
WI0502 # 07 Y:2005 | 07 | 2005 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $2,670 | $520 | Not Implemented |
WI0502 # 08 Y:2005 | 08 | 2005 | IMPROVE LUBRICATION PRACTICES | $1,579 | $1,238 | Not Implemented |
TA0102 # 01 Y:2005 | 01 | 2005 | USE POWER DURING OFF-PEAK PERIODS | $20,445 | $0 | Implemented |
TA0102 # 02 Y:2005 | 02 | 2005 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,027 | $110 | Implemented |
TA0102 # 03 Y:2005 | 03 | 2005 | UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT | $4,700 | $1,800 | Implemented |
TA0102 # 04 Y:2005 | 04 | 2005 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,170 | $0 | Not Implemented |
TA0102 # 05 Y:2005 | 05 | 2005 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $245 | $148 | Not Implemented |
AM0473 # 01 Y:2004 | 01 | 2004 | INSTALL TIMERS AND/OR THERMOSTATS | $13,275 | $2,300 | Implemented |
AM0473 # 02 Y:2004 | 02 | 2004 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $3,780 | $2,320 | Implemented |
AM0473 # 03 Y:2004 | 03 | 2004 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,210 | $400 | Implemented |
AM0473 # 04 Y:2004 | 04 | 2004 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $515 | $1,270 | Not Implemented |
AM0473 # 05 Y:2004 | 05 | 2004 | INSTALL SKYLIGHTS | $360 | $0 | Not Implemented |
AM0473 # 06 Y:2004 | 06 | 2004 | INSTALL OCCUPANCY SENSORS | $350 | $290 | Not Implemented |