IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

21

matching recommendations
Reset
NAICS 33271 Machine Shops
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UA0231 # 06 Y:2020 06 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,948 $4,200 Implemented
UA0231 # 05 Y:2020 05 2020 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,885 $500 Implemented
UA0231 # 04 Y:2020 04 2020 USE PLANT OWNED TRANSFORMERS OR LEASE TRANSFORMERS $3,981 $17,881 Not Implemented
UA0231 # 03 Y:2020 03 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $17,318 $21,905 Not Implemented
UA0231 # 02 Y:2020 02 2020 TURN OFF EQUIPMENT WHEN NOT IN USE $538 $121 Implemented
UA0231 # 01 Y:2020 01 2020 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $37,963 $29,625 Not Implemented
UA0090 # 03 Y:2012 03 2012 KEEP DOORS AND WINDOWS SHUT WHEN NOT ON USE $5,678 $142 Implemented
UA0090 # 07 Y:2012 07 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $10,484 $12,249 Not Implemented
UA0090 # 06 Y:2012 06 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,138 $2,200 Implemented
UA0090 # 05 Y:2012 05 2012 RECOVER WASTE HEAT FROM EQUIPMENT $6,230 $4,203 Not Implemented
UA0090 # 04 Y:2012 04 2012 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $10,518 $13,900 Not Implemented
UA0090 # 02 Y:2012 02 2012 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $6,021 $2,488 Not Implemented
UA0090 # 01 Y:2012 01 2012 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $11,862 $26,757 Not Implemented
UA0057 # 01 Y:2010 01 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $9,876 $3,000 Implemented
UA0057 # 08 Y:2010 08 2010 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $3,029 $12,535 Not Implemented
UA0057 # 07 Y:2010 07 2010 INSTALL TIMERS AND/OR THERMOSTATS $3,185 $1,020 Not Implemented
UA0057 # 06 Y:2010 06 2010 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $6,885 $250 Not Implemented
UA0057 # 05 Y:2010 05 2010 USE PHOTOCELL CONTROLS $8,910 $1,742 Not Implemented
UA0057 # 04 Y:2010 04 2010 LOWER LIGHT FIXTURES IN HIGH CEILING AREAS $11,362 $71,030 Not Implemented
UA0057 # 03 Y:2010 03 2010 TURN OFF EQUIPMENT WHEN NOT IN USE $4,400 $2,080 Implemented
UA0057 # 02 Y:2010 02 2010 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $7,848 $80 Implemented