IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

32

matching recommendations
Reset
NAICS 332710 Machine Shops
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UA0057 # 08 Y:2010 08 2010 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $3,029 $12,535 Not Implemented
UA0057 # 07 Y:2010 07 2010 INSTALL TIMERS AND/OR THERMOSTATS $3,185 $1,020 Not Implemented
UA0057 # 06 Y:2010 06 2010 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $6,885 $250 Not Implemented
UA0057 # 05 Y:2010 05 2010 USE PHOTOCELL CONTROLS $8,910 $1,742 Not Implemented
UA0057 # 04 Y:2010 04 2010 LOWER LIGHT FIXTURES IN HIGH CEILING AREAS $11,362 $71,030 Not Implemented
UA0057 # 03 Y:2010 03 2010 TURN OFF EQUIPMENT WHEN NOT IN USE $4,400 $2,080 Implemented
UA0057 # 02 Y:2010 02 2010 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $7,848 $80 Implemented
UA0057 # 01 Y:2010 01 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $9,876 $3,000 Implemented
IC0174 # 02 Y:2010 02 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,638 $5,817 Not Implemented
IC0174 # 12 Y:2010 12 2010 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $257 $0 Not Implemented
IC0174 # 10 Y:2010 10 2010 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $2,996 $934 Not Implemented
IC0174 # 01 Y:2010 01 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,663 $0 Implemented
IC0174 # 03 Y:2010 03 2010 INSTALL OCCUPANCY SENSORS $1,133 $2,415 Not Implemented
IC0174 # 04 Y:2010 04 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $287 $678 Not Implemented
IC0174 # 05 Y:2010 05 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $30,326 $4,485 Implemented
IC0174 # 06 Y:2010 06 2010 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $2,206 $0 Not Implemented
IC0174 # 07 Y:2010 07 2010 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $1,895 $2,611 Not Implemented
IC0174 # 08 Y:2010 08 2010 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,429 $6,584 Not Implemented
IC0174 # 09 Y:2010 09 2010 AVOID EMERGENCY REWIND OF MOTORS $1,054 $5,472 Not Implemented
IC0174 # 11 Y:2010 11 2010 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $1,966 $7,927 Not Implemented
LE0304 # 08 Y:2010 08 2010 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $1,370 $0 Not Implemented
LE0304 # 09 Y:2010 09 2010 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $1,073 $5,740 Not Implemented
LE0304 # 10 Y:2010 10 2010 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $803 $2,400 Not Implemented
LE0304 # 11 Y:2010 11 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,692 $14,758 Implemented
LE0304 # 12 Y:2010 12 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,240 $11,654 Implemented