Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
188
matching recommendationsNAICS | 33272 | Turned Product and Screw, Nut, and Bolt Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UM0422 # 03 Y:2013 | 03 | 2013 | REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT | $29,593 | $14,120 | Implemented |
LE0363 # 01 Y:2013 | 01 | 2013 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $59,031 | $85,300 | Implemented |
LE0363 # 04 Y:2013 | 04 | 2013 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,978 | $1,000 | Implemented |
LE0363 # 05 Y:2013 | 05 | 2013 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,529 | $2,139 | Implemented |
LE0363 # 07 Y:2013 | 07 | 2013 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $1,878 | $3,800 | Implemented |
SU0342 # 04 Y:2013 | 04 | 2013 | UPGRADE OBSOLETE EQUIPMENT | $344 | $1,388 | Implemented |
LL0344 # 01 Y:2011 | 01 | 2011 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $15,757 | $630 | Implemented |
LL0344 # 02 Y:2011 | 02 | 2011 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,150 | $1,360 | Implemented |
LL0344 # 03 Y:2011 | 03 | 2011 | BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE | $1,859 | $210 | Implemented |
LL0344 # 04 Y:2011 | 04 | 2011 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $1,425 | $575 | Implemented |
LL0344 # 05 Y:2011 | 05 | 2011 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $699 | $480 | Implemented |
BD0386 # 03 Y:2011 | 03 | 2011 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $18,419 | $28,476 | Implemented |
BD0386 # 05 Y:2011 | 05 | 2011 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $5,230 | $3,000 | Implemented |
BD0386 # 06 Y:2011 | 06 | 2011 | RECOVER WASTE HEAT FROM EQUIPMENT | $2,692 | $3,000 | Implemented |
BD0386 # 07 Y:2011 | 07 | 2011 | USE SYNTHETIC LUBRICANT | $4,056 | $1,500 | Implemented |
BD0386 # 08 Y:2011 | 08 | 2011 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $3,153 | $6,680 | Implemented |
BD0386 # 09 Y:2011 | 09 | 2011 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $1,876 | $4,500 | Implemented |
BD0386 # 11 Y:2011 | 11 | 2011 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,916 | $850 | Implemented |
BD0386 # 12 Y:2011 | 12 | 2011 | INSTALL OCCUPANCY SENSORS | $479 | $450 | Implemented |
BD0386 # 13 Y:2011 | 13 | 2011 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $221 | $285 | Implemented |
BD0386 # 14 Y:2011 | 14 | 2011 | USE EVAPORATION TO CONCENTRATE MATERIAL | $6,567 | $10,000 | Implemented |
LL0335 # 01 Y:2010 | 01 | 2010 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $8,558 | $4,290 | Implemented |
LL0335 # 08 Y:2010 | 08 | 2010 | INSULATE BARE EQUIPMENT | $313 | $123 | Implemented |
IA0440 # 01 Y:2009 | 01 | 2009 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,119 | $2,112 | Implemented |
IA0440 # 02 Y:2009 | 02 | 2009 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $241 | $200 | Implemented |