IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

487

matching recommendations
Reset
NAICS 33272 Turned Product and Screw, Nut, and Bolt Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WV0380 # 01 Y:2008 01 2008 OPTIMIZE PLANT POWER FACTOR $18,045 $7,420 Not Implemented
WV0380 # 02 Y:2008 02 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $14,037 $8,850 Implemented
WV0380 # 03 Y:2008 03 2008 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $7,429 $3,300 Not Implemented
WV0380 # 04 Y:2008 04 2008 DE-ENERGIZE EXCESS TRANSFORMER CAPACITY $6,055 $4,950 Not Implemented
WV0380 # 05 Y:2008 05 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,310 $0 Implemented
WV0380 # 06 Y:2008 06 2008 RECOVER WASTE HEAT FROM EQUIPMENT $4,106 $1,120 Not Implemented
WV0380 # 07 Y:2008 07 2008 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM $3,939 $1,690 Implemented
WV0380 # 08 Y:2008 08 2008 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $3,853 $13,200 Not Implemented
WV0380 # 09 Y:2008 09 2008 DEVELOP A REPAIR/REPLACE POLICY $2,626 $1,018 Implemented
WV0380 # 10 Y:2008 10 2008 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,058 $30 Implemented
WV0380 # 11 Y:2008 11 2008 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,989 $1,550 Implemented
WV0380 # 12 Y:2008 12 2008 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,891 $0 Implemented
WV0380 # 13 Y:2008 13 2008 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,422 $225 Not Implemented
WV0380 # 14 Y:2008 14 2008 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER $807 $4,400 Not Implemented
LE0275 # 01 Y:2008 01 2008 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $22,241 $20,000 Not Implemented
LE0275 # 02 Y:2008 02 2008 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $16,646 $6,020 Implemented
LE0275 # 03 Y:2008 03 2008 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $12,225 $1,800 Implemented
LE0275 # 04 Y:2008 04 2008 USE RADIANT HEATER FOR SPOT HEATING $9,912 $5,250 Not Implemented
LE0275 # 05 Y:2008 05 2008 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $9,781 $2,200 Not Implemented
LE0275 # 06 Y:2008 06 2008 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,675 $1,000 Implemented
LE0275 # 07 Y:2008 07 2008 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,495 $11,500 Not Implemented
LE0275 # 08 Y:2008 08 2008 INSTALL OCCUPANCY SENSORS $5,121 $300 Implemented
LE0275 # 09 Y:2008 09 2008 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $2,949 $4,000 Not Implemented
LE0275 # 10 Y:2008 10 2008 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,664 $50 Implemented
LE0275 # 11 Y:2008 11 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $13,143 $47,522 Not Implemented