IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

487

matching recommendations
Reset
NAICS 33272 Turned Product and Screw, Nut, and Bolt Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
BD0261 # 08 Y:2004 08 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $199 $117 Not Implemented
BD0261 # 09 Y:2004 09 2004 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $159 $300 Implemented
BD0261 # 10 Y:2004 10 2004 MODIFY PROCESS TO REDUCE MATERIAL USE/COST $20,632 $400 Implemented
BD0261 # 11 Y:2004 11 2004 USE EVAPORATION TO CONCENTRATE MATERIAL $1,331 $2 Implemented
BD0261 # 12 Y:2004 12 2004 SEPARATE AND RECYCLE SCRAP METAL TO FOUNDRY OR FOR SALE $1,000 $240 Implemented
BD0261 # 13 Y:2004 13 2004 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER $847 $102 Implemented
BD0261 # 14 Y:2004 14 2004 MINIMIZE WATER USAGE $702 $1,035 Not Implemented
BD0261 # 15 Y:2004 15 2004 INSTALL AUTOMATIC BOILER FUEL FEED SYSTEM $49,566 $91,500 Implemented
BD0261 # 16 Y:2004 16 2004 PURCHASE NEW EQUIPMENT TO REDUCE MATERIAL USE / COST $54,392 $210,000 Implemented
SD0330 # 01 Y:2003 01 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $20,782 $1,425 Not Implemented
SD0330 # 02 Y:2003 02 2003 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $3,189 $6,000 Not Implemented
SD0330 # 03 Y:2003 03 2003 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $1,836 $4,000 Not Implemented
SD0330 # 04 Y:2003 04 2003 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $887 $80 Implemented
SD0330 # 05 Y:2003 05 2003 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $3,500 $10,000 Not Implemented
SD0330 # 06 Y:2003 06 2003 AUTOMATE FINISHING PROCESS $96,800 $200,000 Not Implemented
WV0275 # 01 Y:2003 01 2003 REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT $277,857 $145,760 Not Implemented
WV0275 # 02 Y:2003 02 2003 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY $29,059 $900 Implemented
WV0275 # 03 Y:2003 03 2003 RECOVER WASTE HEAT FROM EQUIPMENT $16,752 $1,110 Not Implemented
WV0275 # 04 Y:2003 04 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $16,337 $7,217 Not Implemented
WV0275 # 05 Y:2003 05 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $16,308 $0 Implemented
WV0275 # 06 Y:2003 06 2003 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $13,654 $800 Implemented
WV0275 # 07 Y:2003 07 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $13,244 $8,370 Implemented
WV0275 # 08 Y:2003 08 2003 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $13,170 $360 Implemented
WV0275 # 09 Y:2003 09 2003 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $12,345 $1,860 Not Implemented
WV0275 # 10 Y:2003 10 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $9,549 $500 Implemented