IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

487

matching recommendations
Reset
NAICS 33272 Turned Product and Screw, Nut, and Bolt Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SU0524 # 02 Y:2022 02 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $12,837 $2,064 Not Implemented
SU0524 # 03 Y:2022 03 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,106 $875 Not Implemented
SU0524 # 04 Y:2022 04 2022 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $1,422 $650 Not Implemented
SU0524 # 05 Y:2022 05 2022 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $525 $462 Not Implemented
SU0524 # 06 Y:2022 06 2022 REDUCE VENTILATION AIR $314 $510 Not Implemented
AM0788 # 06 Y:2019 06 2019 INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS $860 $124 Implemented
AM0788 # 05 Y:2019 05 2019 PAY UTILITY BILLS ON TIME $1,270 $0 Implemented
AM0788 # 04 Y:2019 04 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,125 $4,520 Implemented
AM0788 # 03 Y:2019 03 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,200 $17,300 Implemented
AM0788 # 02 Y:2019 02 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,355 $1,000 Implemented
AM0788 # 01 Y:2019 01 2019 OPTIMIZE PLANT POWER FACTOR $10,300 $28,750 Not Implemented
IP0127 # 01 Y:2019 01 2019 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $2,178 $0 Not Implemented
IP0127 # 02 Y:2019 02 2019 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $1,715 $30 Not Implemented
IP0127 # 03 Y:2019 03 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,511 $70 Implemented
IP0127 # 04 Y:2019 04 2019 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $6,687 $2,825 Implemented
IP0127 # 05 Y:2019 05 2019 INSTALL OCCUPANCY SENSORS $13,877 $9,532 Not Implemented
IP0127 # 06 Y:2019 06 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $17,631 $46,979 Not Implemented
IP0127 # 07 Y:2019 07 2019 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $130,871 $597,520 Not Implemented
UD1003 # 06 Y:2019 06 2019 USE PHOTOCELL CONTROLS $1,712 $3,540 Not Implemented
UD1003 # 05 Y:2019 05 2019 INSTALL OCCUPANCY SENSORS $2,159 $728 Not Implemented
UD1003 # 04 Y:2019 04 2019 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,211 $0 Implemented
UD1003 # 03 Y:2019 03 2019 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $4,920 $0 Not Implemented
UD1003 # 02 Y:2019 02 2019 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $17,300 $4,100 Implemented
UD1003 # 01 Y:2019 01 2019 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $3,324 $0 Not Implemented
UD1002 # 06 Y:2019 06 2019 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $5,631 $0 Not Implemented