Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
28
matching recommendationsNAICS | 33272 | Turned Product and Screw, Nut, and Bolt Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
SD0330 # 06 Y:2003 | 06 | 2003 | AUTOMATE FINISHING PROCESS | $96,800 | $200,000 | Not Implemented |
WV0275 # 12 Y:2003 | 12 | 2003 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $8,440 | $1,200 | Not Implemented |
WV0275 # 11 Y:2003 | 11 | 2003 | BURN WASTE OIL FOR HEAT | $9,135 | $3,600 | Not Implemented |
WV0275 # 10 Y:2003 | 10 | 2003 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $9,549 | $500 | Implemented |
WV0275 # 09 Y:2003 | 09 | 2003 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $12,345 | $1,860 | Not Implemented |
WV0275 # 08 Y:2003 | 08 | 2003 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $13,170 | $360 | Implemented |
WV0275 # 07 Y:2003 | 07 | 2003 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $13,244 | $8,370 | Implemented |
WV0275 # 06 Y:2003 | 06 | 2003 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $13,654 | $800 | Implemented |
WV0275 # 05 Y:2003 | 05 | 2003 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $16,308 | $0 | Implemented |
WV0275 # 04 Y:2003 | 04 | 2003 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $16,337 | $7,217 | Not Implemented |
WV0275 # 03 Y:2003 | 03 | 2003 | RECOVER WASTE HEAT FROM EQUIPMENT | $16,752 | $1,110 | Not Implemented |
WV0275 # 02 Y:2003 | 02 | 2003 | USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY | $29,059 | $900 | Implemented |
WV0275 # 01 Y:2003 | 01 | 2003 | REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT | $277,857 | $145,760 | Not Implemented |
SD0330 # 05 Y:2003 | 05 | 2003 | INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS | $3,500 | $10,000 | Not Implemented |
SD0330 # 04 Y:2003 | 04 | 2003 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $887 | $80 | Implemented |
SD0330 # 03 Y:2003 | 03 | 2003 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $1,836 | $4,000 | Not Implemented |
SD0330 # 02 Y:2003 | 02 | 2003 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $3,189 | $6,000 | Not Implemented |
SD0330 # 01 Y:2003 | 01 | 2003 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $20,782 | $1,425 | Not Implemented |
WV0275 # 13 Y:2003 | 13 | 2003 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $3,716 | $1,300 | Not Implemented |
WV0275 # 14 Y:2003 | 14 | 2003 | INSTALL OCCUPANCY SENSORS | $2,336 | $1,200 | Implemented |
OK0662 # 01 Y:2003 | 01 | 2003 | USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE | $832 | $3,222 | Not Implemented |
OK0662 # 06 Y:2003 | 06 | 2003 | INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT | $6,326 | $23,100 | n/a |
OK0662 # 05 Y:2003 | 05 | 2003 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $165 | $864 | Not Implemented |
OK0662 # 04 Y:2003 | 04 | 2003 | INSULATE BARE EQUIPMENT | $406 | $221 | Not Implemented |
OK0662 # 03 Y:2003 | 03 | 2003 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $2,135 | $3,289 | Not Implemented |