IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

272

matching recommendations
Reset
NAICS 332722 Bolt, Nut, Screw, Rivet, and Washer Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IC0139 # 07 Y:2008 07 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $19,058 $103,849 Not Implemented
IC0139 # 08 Y:2008 08 2008 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $2,303 $6,227 Not Implemented
IC0139 # 09 Y:2008 09 2008 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $92 $269 Not Implemented
IC0139 # 10 Y:2008 10 2008 INSULATE BARE EQUIPMENT $2,623 $1,416 Not Implemented
IC0139 # 11 Y:2008 11 2008 CONVERT COMBUSTION EQUIPMENT TO BURN OIL $7,860 $23,865 Not Implemented
IC0139 # 12 Y:2008 12 2008 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $4,079 $0 Implemented
IC0139 # 13 Y:2008 13 2008 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $779 $0 Implemented
IC0139 # 14 Y:2008 14 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $833 $231 Implemented
UM0323 # 01 Y:2007 01 2007 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $7,469 $3,500 Implemented
UM0323 # 02 Y:2007 02 2007 INSULATE BARE EQUIPMENT $7,978 $1,000 Implemented
UM0323 # 03 Y:2007 03 2007 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $15,247 $2,653 Implemented
UM0323 # 04 Y:2007 04 2007 TURN OFF EQUIPMENT WHEN NOT IN USE $6,815 $500 Implemented
UM0323 # 05 Y:2007 05 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,347 $8,175 Implemented
UM0323 # 06 Y:2007 06 2007 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $6,157 $1,836 Implemented
UM0323 # 07 Y:2007 07 2007 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $1,934 $6,822 Not Implemented
UM0323 # 08 Y:2007 08 2007 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,360 $100 Not Implemented
UM0323 # 09 Y:2007 09 2007 REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES $2,628 $4,248 Implemented
UM0323 # 10 Y:2007 10 2007 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,122 $1,000 Implemented
UM0323 # 11 Y:2007 11 2007 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $946 $1,000 Implemented
UM0323 # 12 Y:2007 12 2007 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $615 $75 Implemented
UM0323 # 13 Y:2007 13 2007 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $513 $206 Implemented
MS0287 # 01 Y:2006 01 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $30,298 $78,252 Not Implemented
MS0287 # 02 Y:2006 02 2006 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $17,250 $41 Not Implemented
MS0287 # 03 Y:2006 03 2006 CONDENSE OPERATION INTO ONE BUILDING $9,134 $100 Not Implemented
MS0287 # 04 Y:2006 04 2006 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $8,563 $4,617 Not Implemented