Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
1,826
matching recommendationsNAICS | 33281 | Coating, Engraving, Heat Treating, and Allied Activities |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UU0263 # 09 Y:2025 | 09 | 2025 | OPTIMIZE PLANT POWER FACTOR | $3,940 | $9,000 | n/a |
UU0263 # 10 Y:2025 | 10 | 2025 | PAY UTILITY BILLS ON TIME | $1,860 | $1,500 | n/a |
UU0263 # 04 Y:2025 | 04 | 2025 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $1,805 | $8,150 | n/a |
UU0263 # 07 Y:2025 | 07 | 2025 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $5,270 | $7,380 | n/a |
UU0263 # 06 Y:2025 | 06 | 2025 | PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER | $4,840 | $11,200 | n/a |
UU0263 # 11 Y:2025 | 11 | 2025 | APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES | $8,090 | $5,000 | n/a |
UU0263 # 05 Y:2025 | 05 | 2025 | REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC | $3,948 | $2,110 | n/a |
UU0263 # 12 Y:2025 | 12 | 2025 | REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT | $32,910 | $158,576 | n/a |
UU0263 # 01 Y:2025 | 01 | 2025 | INSTALL COMMON HEADER ON COMPRESSORS | $7,583 | $46,630 | n/a |
UU0263 # 02 Y:2025 | 02 | 2025 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $7,105 | $5,100 | n/a |
IC0317 # 03 Y:2025 | 03 | 2025 | RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS | $930 | $0 | n/a |
IC0317 # 12 Y:2025 | 12 | 2025 | INSTALL SMALLER BOILER (INCREASE HIGH FIRE DUTY CYCLE) | $11,344 | $21,200 | n/a |
IC0317 # 13 Y:2025 | 13 | 2025 | INSULATE BARE EQUIPMENT | $2,154 | $4,516 | n/a |
IC0317 # 08 Y:2025 | 08 | 2025 | USE RADIANT HEATER FOR SPOT HEATING | $15,053 | $20,087 | n/a |
IC0317 # 05 Y:2025 | 05 | 2025 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $2,337 | $108 | n/a |
IC0317 # 06 Y:2025 | 06 | 2025 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $704 | $0 | n/a |
IC0317 # 02 Y:2025 | 02 | 2025 | CENTRALIZE CONTROL OF EXHAUST FANS TO ENSURE THEIR SHUTDOWN, OR ESTABLISH PROGRAM TO ENSURE MANUAL SHUTDOWN | $10,127 | $7,240 | n/a |
IC0317 # 11 Y:2025 | 11 | 2025 | INSTALL OCCUPANCY SENSORS | $151 | $425 | n/a |
IC0317 # 07 Y:2025 | 07 | 2025 | USE SOLAR HEAT TO MAKE ELECTRICTY | $32,668 | $258,530 | n/a |
IC0317 # 09 Y:2025 | 09 | 2025 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $972 | $2,234 | n/a |
IC0317 # 10 Y:2025 | 10 | 2025 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $397 | $597 | n/a |
IC0317 # 04 Y:2025 | 04 | 2025 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $431 | $1,113 | n/a |
IC0317 # 01 Y:2025 | 01 | 2025 | INSTALL EFFICIENT RECTIFIERS | $6,191 | $19,124 | n/a |
SJ0028 # 05 Y:2025 | 05 | 2025 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $2,098 | $0 | n/a |
SJ0028 # 04 Y:2025 | 04 | 2025 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $69 | $62 | n/a |