IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,826

matching recommendations
Reset
NAICS 33281 Coating, Engraving, Heat Treating, and Allied Activities
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UU0263 # 09 Y:2025 09 2025 OPTIMIZE PLANT POWER FACTOR $3,940 $9,000 n/a
UU0263 # 10 Y:2025 10 2025 PAY UTILITY BILLS ON TIME $1,860 $1,500 n/a
UU0263 # 04 Y:2025 04 2025 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $1,805 $8,150 n/a
UU0263 # 07 Y:2025 07 2025 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $5,270 $7,380 n/a
UU0263 # 06 Y:2025 06 2025 PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER $4,840 $11,200 n/a
UU0263 # 11 Y:2025 11 2025 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $8,090 $5,000 n/a
UU0263 # 05 Y:2025 05 2025 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC $3,948 $2,110 n/a
UU0263 # 12 Y:2025 12 2025 REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT $32,910 $158,576 n/a
UU0263 # 01 Y:2025 01 2025 INSTALL COMMON HEADER ON COMPRESSORS $7,583 $46,630 n/a
UU0263 # 02 Y:2025 02 2025 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $7,105 $5,100 n/a
IC0317 # 03 Y:2025 03 2025 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $930 $0 n/a
IC0317 # 12 Y:2025 12 2025 INSTALL SMALLER BOILER (INCREASE HIGH FIRE DUTY CYCLE) $11,344 $21,200 n/a
IC0317 # 13 Y:2025 13 2025 INSULATE BARE EQUIPMENT $2,154 $4,516 n/a
IC0317 # 08 Y:2025 08 2025 USE RADIANT HEATER FOR SPOT HEATING $15,053 $20,087 n/a
IC0317 # 05 Y:2025 05 2025 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $2,337 $108 n/a
IC0317 # 06 Y:2025 06 2025 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $704 $0 n/a
IC0317 # 02 Y:2025 02 2025 CENTRALIZE CONTROL OF EXHAUST FANS TO ENSURE THEIR SHUTDOWN, OR ESTABLISH PROGRAM TO ENSURE MANUAL SHUTDOWN $10,127 $7,240 n/a
IC0317 # 11 Y:2025 11 2025 INSTALL OCCUPANCY SENSORS $151 $425 n/a
IC0317 # 07 Y:2025 07 2025 USE SOLAR HEAT TO MAKE ELECTRICTY $32,668 $258,530 n/a
IC0317 # 09 Y:2025 09 2025 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $972 $2,234 n/a
IC0317 # 10 Y:2025 10 2025 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $397 $597 n/a
IC0317 # 04 Y:2025 04 2025 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $431 $1,113 n/a
IC0317 # 01 Y:2025 01 2025 INSTALL EFFICIENT RECTIFIERS $6,191 $19,124 n/a
SJ0028 # 05 Y:2025 05 2025 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $2,098 $0 n/a
SJ0028 # 04 Y:2025 04 2025 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $69 $62 n/a