Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
1,834
matching recommendationsNAICS | 33281 | Coating, Engraving, Heat Treating, and Allied Activities |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
AM0914 # 01 Y:2024 | 01 | 2024 | OPTIMIZE PLANT POWER FACTOR | $40,720 | $77,840 | n/a |
AM0914 # 02 Y:2024 | 02 | 2024 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,190 | $2,260 | n/a |
AM0914 # 03 Y:2024 | 03 | 2024 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,515 | $0 | n/a |
AM0914 # 04 Y:2024 | 04 | 2024 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,310 | $0 | n/a |
WV0661 # 01 Y:2024 | 01 | 2024 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $6,612 | $15,969 | Not Implemented |
WV0661 # 02 Y:2024 | 02 | 2024 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $4,983 | $9,744 | Not Implemented |
WV0661 # 03 Y:2024 | 03 | 2024 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $4,731 | $9,700 | Not Implemented |
WV0661 # 04 Y:2024 | 04 | 2024 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $2,626 | $12,165 | Implemented |
WV0661 # 05 Y:2024 | 05 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,184 | $473 | Implemented |
WV0661 # 06 Y:2024 | 06 | 2024 | UPGRADE CONTROLS ON COMPRESSORS | $1,021 | $3,645 | Not Implemented |
WV0661 # 07 Y:2024 | 07 | 2024 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $618 | $2,517 | Implemented |
WV0661 # 08 Y:2024 | 08 | 2024 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $523 | $314 | Implemented |
WV0661 # 09 Y:2024 | 09 | 2024 | INSULATE BARE EQUIPMENT | $367 | $355 | Implemented |
WV0661 # 10 Y:2024 | 10 | 2024 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $233 | $140 | Implemented |
WV0661 # 11 Y:2024 | 11 | 2024 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $218 | $713 | Implemented |
MZ0358 # 01 Y:2024 | 01 | 2024 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $9,335 | $1,200 | Implemented |
MZ0358 # 02 Y:2024 | 02 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,322 | $200 | Implemented |
MZ0358 # 03 Y:2024 | 03 | 2024 | INSTALL OCCUPANCY SENSORS | $1,050 | $2,050 | Implemented |
MZ0358 # 04 Y:2024 | 04 | 2024 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $1,826 | $1,760 | Implemented |
MZ0358 # 05 Y:2024 | 05 | 2024 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,179 | $320 | Implemented |
MZ0358 # 06 Y:2024 | 06 | 2024 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $8,666 | $2,000 | Implemented |
MZ0358 # 07 Y:2024 | 07 | 2024 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT INCOMING FLUIDS | $4,887 | $14,220 | Not Implemented |
SF0617 # 01 Y:2024 | 01 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $16,186 | $0 | n/a |
SF0617 # 02 Y:2024 | 02 | 2024 | REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES | $6,885 | $3,504 | n/a |
SF0617 # 03 Y:2024 | 03 | 2024 | RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR | $99,094 | $49,118 | n/a |