Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
1,834
matching recommendationsNAICS | 33281 | Coating, Engraving, Heat Treating, and Allied Activities |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
BD0266 # 08 Y:2004 | 08 | 2004 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $329 | $510 | Implemented |
BD0266 # 09 Y:2004 | 09 | 2004 | INSTALL FLOATING COVERS ON TANKS OF VOLATILE MATERIALS TO REDUCE EVAPORATION | $2,462 | $1,575 | Not Implemented |
BD0266 # 10 Y:2004 | 10 | 2004 | SEPARATE AND RECYCLE SCRAP METAL TO FOUNDRY OR FOR SALE | $1,020 | $96 | Implemented |
BD0266 # 11 Y:2004 | 11 | 2004 | REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES | $3,200 | $96 | Implemented |
BD0266 # 12 Y:2004 | 12 | 2004 | USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION | $1,404 | $2,500 | Implemented |
LM0081 # 01 Y:2004 | 01 | 2004 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,802 | $0 | Not Implemented |
LM0081 # 02 Y:2004 | 02 | 2004 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $2,857 | $300 | Implemented |
LM0081 # 03 Y:2004 | 03 | 2004 | SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY | $85 | $0 | Not Implemented |
LM0081 # 04 Y:2004 | 04 | 2004 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $160 | $80 | Not Implemented |
LM0081 # 05 Y:2004 | 05 | 2004 | MAINTAIN CLEAN CONDITIONS BEFORE PAINTING | $233,065 | $1,000 | Not Implemented |
LM0081 # 06 Y:2004 | 06 | 2004 | MAINTAIN CLEAN CONDITIONS BEFORE PAINTING | $292,248 | $4,925 | Not Implemented |
LM0081 # 07 Y:2004 | 07 | 2004 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $4,611 | $1,814 | Not Implemented |
SF0289 # 01 Y:2004 | 01 | 2004 | USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE | $2,527 | $2,527 | Implemented |
SF0289 # 02 Y:2004 | 02 | 2004 | USE INSULATION IN FURNACES TO FACILITATE HEATING / COOLING | $956 | $180 | Implemented |
SF0289 # 03 Y:2004 | 03 | 2004 | INSTALL OCCUPANCY SENSORS | $1,280 | $1,280 | Not Implemented |
SF0289 # 04 Y:2004 | 04 | 2004 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $864 | $1,183 | Not Implemented |
SF0289 # 05 Y:2004 | 05 | 2004 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $8,525 | $12,060 | Not Implemented |
SF0289 # 06 Y:2004 | 06 | 2004 | SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY | $270 | $885 | Implemented |
SF0289 # 07 Y:2004 | 07 | 2004 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $3,506 | $6,000 | Not Implemented |
SF0289 # 08 Y:2004 | 08 | 2004 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,750 | $6,748 | Implemented |
SF0289 # 09 Y:2004 | 09 | 2004 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $449 | $960 | Not Implemented |
SF0289 # 10 Y:2004 | 10 | 2004 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $7,873 | $100 | Not Implemented |
MA0558 # 01 Y:2004 | 01 | 2004 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $28,200 | $4,500 | Implemented |
MA0558 # 02 Y:2004 | 02 | 2004 | USE MINIMUM STEAM OPERATING PRESSURE | $19,575 | $1,000 | Not Implemented |
MA0558 # 03 Y:2004 | 03 | 2004 | USE WASTE HEAT FROM FLUE GASES TO HEAT SPACE CONDITIONING AIR | $12,830 | $5,000 | Implemented |