IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,724

matching recommendations
Reset
NAICS 33281 Coating, Engraving, Heat Treating, and Allied Activities
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MA0548 # 05 Y:2004 05 2004 INSTALL TIMERS AND/OR THERMOSTATS $1,528 $1,625 Not Implemented
MA0548 # 06 Y:2004 06 2004 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $699 $3,574 Not Implemented
MA0548 # 07 Y:2004 07 2004 RECOVER WASTE HEAT FROM EQUIPMENT $653 $200 Not Implemented
MA0548 # 08 Y:2004 08 2004 REDUCE VENTILATION AIR $607 $1,831 Not Implemented
MA0548 # 09 Y:2004 09 2004 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $414 $200 Not Implemented
SF0279 # 01 Y:2004 01 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $699 $0 Implemented
SF0279 # 02 Y:2004 02 2004 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $11,368 $11,810 Not Implemented
SF0279 # 03 Y:2004 03 2004 INSTALL OCCUPANCY SENSORS $1,168 $1,200 Not Implemented
SF0279 # 04 Y:2004 04 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,520 $13,375 Implemented
SF0279 # 05 Y:2004 05 2004 OPTIMIZE PLANT POWER FACTOR $1,079 $1,376 Not Implemented
AS0373 # 01 Y:2004 01 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,560 $8,230 Not Implemented
AS0373 # 02 Y:2004 02 2004 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $504 $456 Not Implemented
AS0373 # 03 Y:2004 03 2004 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $337 $1,400 Not Implemented
AS0373 # 04 Y:2004 04 2004 REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT $28,518 $60,100 Not Implemented
AS0373 # 05 Y:2004 05 2004 PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT $1,794 $3,500 Not Implemented
UD0686 # 01 Y:2004 01 2004 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $17,224 $7,681 Not Implemented
UD0686 # 02 Y:2004 02 2004 COVER OPEN TANKS $6,907 $1,110 Not Implemented
UD0686 # 03 Y:2004 03 2004 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $4,095 $0 Not Implemented
UD0686 # 04 Y:2004 04 2004 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $3,750 $0 Not Implemented
UD0686 # 05 Y:2004 05 2004 CONVERT FROM INDIRECT TO DIRECT FIRED SYSTEMS $2,043 $2,478 Not Implemented
UD0686 # 06 Y:2004 06 2004 DISCONNECT BALLASTS $885 $667 Not Implemented
UD0686 # 07 Y:2004 07 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $620 $240 Implemented
UD0686 # 08 Y:2004 08 2004 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $392 $450 Implemented
UD0686 # 09 Y:2004 09 2004 $285 $0 Implemented
UD0686 # 10 Y:2004 10 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $196 $297 Not Implemented