IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,713

matching recommendations
Reset
NAICS 33281 Coating, Engraving, Heat Treating, and Allied Activities
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
CI0005 # 02 Y:2022 02 2022 REPLACE BOILER $15,803 $9,000 n/a
CI0005 # 03 Y:2022 03 2022 ADJUST / MAINTAIN FORK LIFT TRUCKS FOR MOST EFFICIENT OPERATION $9,639 $30,000 n/a
CI0005 # 04 Y:2022 04 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,840 $300 n/a
CI0005 # 05 Y:2022 05 2022 USE SOLAR HEAT TO MAKE ELECTRICTY $3,625 $13,372 n/a
CI0005 # 06 Y:2022 06 2022 STORE HEATED/ COOLED WATER FOR USE DURING PEAK DEMAND PERIODS $2,348 $8,100 n/a
CI0005 # 07 Y:2022 07 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,483 $99 n/a
CI0005 # 08 Y:2022 08 2022 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,446 $0 n/a
CI0005 # 09 Y:2022 09 2022 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $563 $500 n/a
CI0005 # 10 Y:2022 10 2022 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $323 $0 n/a
SD0623 # 01 Y:2023 01 2023 PREVENT EXCESSIVE SOLVENT USAGE (OPERATOR TRAINING) $49,875 $0 Implemented
SD0623 # 02 Y:2023 02 2023 USE SOLAR HEAT TO MAKE ELECTRICTY $43,378 $245,406 Not Implemented
SD0623 # 03 Y:2023 03 2023 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $6,262 $500 Implemented
SD0623 # 04 Y:2023 04 2023 UPGRADE CONTROLS ON COMPRESSORS $2,157 $6,534 Not Implemented
SD0623 # 05 Y:2023 05 2023 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $3,218 $7,000 Not Implemented
SU0526 # 01 Y:2022 01 2022 DISCONNECT BALLASTS $4,882 $0 Not Implemented
SU0526 # 02 Y:2022 02 2022 PAY BILLS ON TIME TO AVOID LATE FEES $1,969 $0 Not Implemented
SU0526 # 03 Y:2022 03 2022 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $1,491 $52 Not Implemented
SU0526 # 04 Y:2022 04 2022 RECOVER WASTE HEAT FROM EQUIPMENT $6,343 $792 Not Implemented
SU0526 # 05 Y:2022 05 2022 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,823 $447 Not Implemented
SU0526 # 06 Y:2022 06 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $433 $284 Not Implemented
SU0526 # 07 Y:2022 07 2022 INSTALL SET-BACK TIMERS $423 $627 Not Implemented
SU0526 # 08 Y:2022 08 2022 USE SOLAR HEAT TO MAKE ELECTRICTY $158,273 $259,521 Not Implemented
SU0526 # 09 Y:2022 09 2022 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $9,454 $16,991 Not Implemented
SU0526 # 10 Y:2022 10 2022 RECOVER WASTE HEAT FROM EQUIPMENT $98 $369 Not Implemented
SF0593 # 01 Y:2023 01 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $16,621 $0 Implemented