Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
261
matching recommendationsNAICS | 33281 | Coating, Engraving, Heat Treating, and Allied Activities |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
WV0326 # 05 Y:2005 | 05 | 2005 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $2,818 | $1,000 | Implemented |
WV0326 # 06 Y:2005 | 06 | 2005 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,047 | $3,517 | Not Implemented |
WV0326 # 07 Y:2005 | 07 | 2005 | USE WASTE HEAT FROM FLUE GASES TO HEAT SPACE CONDITIONING AIR | $780 | $1,076 | Implemented |
WV0326 # 08 Y:2005 | 08 | 2005 | UTILIZE A LESS EXPENSIVE COOLING METHOD | $652 | $367 | Implemented |
WV0326 # 09 Y:2005 | 09 | 2005 | USE SYNTHETIC LUBRICANT | $577 | $17 | Implemented |
WV0326 # 10 Y:2005 | 10 | 2005 | DEVELOP A REPAIR/REPLACE POLICY | $459 | $54 | Implemented |
WV0326 # 11 Y:2005 | 11 | 2005 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $388 | $140 | Not Implemented |
WV0326 # 12 Y:2005 | 12 | 2005 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $295 | $180 | Implemented |
WV0315 # 01 Y:2005 | 01 | 2005 | INSTALL / REPAIR INSULATION ON STEAM LINES | $9,051 | $901 | Implemented |
WV0315 # 02 Y:2005 | 02 | 2005 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $5,726 | $1,000 | Implemented |
WV0315 # 03 Y:2005 | 03 | 2005 | USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER | $4,606 | $3,300 | Not Implemented |
WV0315 # 04 Y:2005 | 04 | 2005 | USE DRYING OVEN (BATCH TYPE) ON ALTERNATE DAYS OR OTHER OPTIMUM SCHEDULE TO RUN EQUIPMENT WITH FULL LOADS | $2,658 | $0 | Implemented |
WV0315 # 05 Y:2005 | 05 | 2005 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,969 | $1,275 | Not Implemented |
WV0315 # 06 Y:2005 | 06 | 2005 | USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING | $1,739 | $1,060 | Not Implemented |
WV0315 # 07 Y:2005 | 07 | 2005 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,495 | $2,560 | Implemented |
WV0315 # 08 Y:2005 | 08 | 2005 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $1,438 | $640 | Implemented |
WV0315 # 09 Y:2005 | 09 | 2005 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,395 | $0 | Not Implemented |
WV0315 # 10 Y:2005 | 10 | 2005 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $1,126 | $20 | Implemented |
WV0315 # 11 Y:2005 | 11 | 2005 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $985 | $140 | Implemented |
WV0315 # 12 Y:2005 | 12 | 2005 | DEVELOP A REPAIR/REPLACE POLICY | $550 | $97 | Not Implemented |
WV0315 # 13 Y:2005 | 13 | 2005 | UTILIZE A LESS EXPENSIVE COOLING METHOD | $521 | $609 | Not Implemented |
WV0315 # 14 Y:2005 | 14 | 2005 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $467 | $20 | Implemented |
UD0707 # 01 Y:2004 | 01 | 2004 | CHECK FOR ACCURACY OF UTILITY / POWER METERS | $63,251 | $782 | Not Implemented |
UD0707 # 02 Y:2004 | 02 | 2004 | COVER OPEN TANKS | $27,270 | $4,326 | Implemented |
UD0707 # 03 Y:2004 | 03 | 2004 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $19,956 | $31,342 | Implemented |