Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
218
matching recommendationsNAICS | 33281 | Coating, Engraving, Heat Treating, and Allied Activities |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
SJ0028 # 02 Y:2025 | 02 | 2025 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $6,130 | $0 | n/a |
SJ0028 # 03 Y:2025 | 03 | 2025 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,344 | $2,064 | n/a |
SJ0028 # 01 Y:2025 | 01 | 2025 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $2,778 | $9,383 | n/a |
SJ0028 # 05 Y:2025 | 05 | 2025 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $2,098 | $0 | n/a |
SJ0028 # 04 Y:2025 | 04 | 2025 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $69 | $62 | n/a |
SJ0025 # 06 Y:2024 | 06 | 2024 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $31,290 | $0 | n/a |
SJ0025 # 10 Y:2024 | 10 | 2024 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $11,258 | $0 | n/a |
SJ0025 # 03 Y:2024 | 03 | 2024 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,130 | $16,703 | n/a |
SJ0025 # 09 Y:2024 | 09 | 2024 | INSTALL OCCUPANCY SENSORS | $182 | $160 | n/a |
SJ0025 # 04 Y:2024 | 04 | 2024 | TURN OFF EQUIPMENT WHEN NOT IN USE | $6,936 | $0 | n/a |
SJ0025 # 02 Y:2024 | 02 | 2024 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $991 | $0 | n/a |
SJ0025 # 08 Y:2024 | 08 | 2024 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $522 | $2,897 | n/a |
SJ0025 # 01 Y:2024 | 01 | 2024 | USE SOLAR HEAT TO MAKE ELECTRICTY | $67,207 | $14,360 | n/a |
SJ0025 # 07 Y:2024 | 07 | 2024 | SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY | $1,211 | $989 | n/a |
SJ0025 # 05 Y:2024 | 05 | 2024 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $475 | $125 | n/a |
SJ0024 # 03 Y:2024 | 03 | 2024 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $490 | $0 | n/a |
SJ0024 # 04 Y:2024 | 04 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $8,182 | $0 | n/a |
SJ0024 # 01 Y:2024 | 01 | 2024 | USE SOLAR HEAT TO MAKE ELECTRICTY | $45,462 | $42,170 | n/a |
SJ0024 # 02 Y:2024 | 02 | 2024 | USE BATTERY STORAGE FOR DEMAND CONTROL | $3,606 | $5,559 | n/a |
SJ0024 # 06 Y:2024 | 06 | 2024 | TURN OFF EQUIPMENT WHEN NOT IN USE | $1,248 | $0 | n/a |
SJ0024 # 05 Y:2024 | 05 | 2024 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,292 | $8,243 | n/a |
SJ0023 # 02 Y:2024 | 02 | 2024 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $848 | $2,144 | n/a |
SJ0023 # 01 Y:2024 | 01 | 2024 | USE SOLAR HEAT TO MAKE ELECTRICTY | $21,134 | $146,494 | n/a |
SJ0023 # 07 Y:2024 | 07 | 2024 | INSULATE BARE EQUIPMENT | $190 | $380 | n/a |
SJ0023 # 03 Y:2024 | 03 | 2024 | INSTALL OCCUPANCY SENSORS | $1,478 | $305 | n/a |