Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
125
matching recommendationsNAICS | 33281 | Coating, Engraving, Heat Treating, and Allied Activities |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MU0024 # 02 Y:2023 | 02 | 2023 | USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING | $11,030 | $122,000 | Not Implemented |
MU0024 # 03 Y:2023 | 03 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,238 | $4,250 | Implemented |
MU0024 # 01 Y:2023 | 01 | 2023 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $14,863 | $294,000 | Implemented |
MU0024 # 04 Y:2023 | 04 | 2023 | INSTALL OCCUPANCY SENSORS | $247 | $260 | Not Implemented |
MU0024 # 05 Y:2023 | 05 | 2023 | CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS | $203 | $76 | Implemented |
IC0227 # 02 Y:2019 | 02 | 2019 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $1,441 | $1,500 | Not Implemented |
IC0227 # 04 Y:2019 | 04 | 2019 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $4,978 | $9,600 | Not Implemented |
IC0227 # 01 Y:2019 | 01 | 2019 | REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT | $3,221 | $800 | Not Implemented |
IC0227 # 03 Y:2019 | 03 | 2019 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $7,117 | $7,146 | Not Implemented |
IC0227 # 05 Y:2019 | 05 | 2019 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $7,871 | $28,000 | Not Implemented |
UM0473 # 02 Y:2016 | 02 | 2016 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,050 | $1,000 | n/a |
UM0473 # 04 Y:2016 | 04 | 2016 | COVER OPEN TANKS | $52,272 | $2,335 | n/a |
UM0473 # 05 Y:2016 | 05 | 2016 | REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT | $2,899 | $2,835 | n/a |
UM0473 # 06 Y:2016 | 06 | 2016 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $7,291 | $23,462 | n/a |
UM0473 # 01 Y:2016 | 01 | 2016 | OPTIMIZE PLANT POWER FACTOR | $6,129 | $15,000 | n/a |
UM0473 # 07 Y:2016 | 07 | 2016 | INSTALL OCCUPANCY SENSORS | $2,449 | $630 | n/a |
UM0473 # 08 Y:2016 | 08 | 2016 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $3,901 | $10,265 | n/a |
UM0473 # 03 Y:2016 | 03 | 2016 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $3,566 | $1,000 | n/a |
UM0468 # 02 Y:2016 | 02 | 2016 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $4,680 | $2,150 | Not Implemented |
UM0468 # 01 Y:2016 | 01 | 2016 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $695 | $1,500 | Not Implemented |
UM0468 # 04 Y:2016 | 04 | 2016 | INSULATE BARE EQUIPMENT | $3,084 | $2,000 | Implemented |
UM0468 # 06 Y:2016 | 06 | 2016 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $3,119 | $10,000 | Not Implemented |
UM0468 # 03 Y:2016 | 03 | 2016 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $15,125 | $43,167 | Implemented |
UM0468 # 05 Y:2016 | 05 | 2016 | INSULATE BARE EQUIPMENT | $1,588 | $1,500 | Implemented |
UM0456 # 04 Y:2015 | 04 | 2015 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $22,704 | $10,000 | Implemented |