Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
142
matching recommendationsNAICS | 332811 | Metal Heat Treating |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UM0372 # 09 Y:2010 | 09 | 2010 | COVER OPEN TANKS | $9,602 | $2,472 | Implemented |
MA0665 # 01 Y:2010 | 01 | 2010 | UPGRADE CONTROLS ON COMPRESSORS | $15,680 | $58,600 | Implemented |
MA0665 # 02 Y:2010 | 02 | 2010 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $3,642 | $18,330 | Implemented |
MA0665 # 04 Y:2010 | 04 | 2010 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $1,470 | $200 | Implemented |
MA0665 # 06 Y:2010 | 06 | 2010 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,028 | $480 | Implemented |
MA0665 # 07 Y:2010 | 07 | 2010 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $155 | $180 | Implemented |
LL0328 # 01 Y:2010 | 01 | 2010 | INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN | $26,498 | $304 | Implemented |
LL0328 # 02 Y:2010 | 02 | 2010 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $9,654 | $3,600 | Implemented |
LL0328 # 03 Y:2010 | 03 | 2010 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $6,572 | $2,800 | Implemented |
TT0029 # 01 Y:2008 | 01 | 2008 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $6,600 | $12,000 | Implemented |
TT0029 # 02 Y:2008 | 02 | 2008 | INSULATE BARE EQUIPMENT | $52,700 | $1,000 | Implemented |
TT0029 # 07 Y:2008 | 07 | 2008 | OPTIMIZE PLANT POWER FACTOR | $4,855 | $13,300 | Implemented |
AM0543 # 01 Y:2008 | 01 | 2008 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $95,000 | $175,000 | Implemented |
AM0543 # 03 Y:2008 | 03 | 2008 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $627 | $0 | Implemented |
AM0543 # 04 Y:2008 | 04 | 2008 | MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED | $205 | $54 | Implemented |
MA0625 # 02 Y:2007 | 02 | 2007 | SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY | $8,935 | $8,000 | Implemented |
MA0625 # 05 Y:2007 | 05 | 2007 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $3,964 | $10,530 | Implemented |
OK0723 # 01 Y:2006 | 01 | 2006 | OPERATE BOILERS ON HIGH FIRE SETTING | $23,600 | $18,000 | Implemented |
OK0723 # 03 Y:2006 | 03 | 2006 | USE INSULATION IN FURNACES TO FACILITATE HEATING / COOLING | $1,135 | $587 | Implemented |
OK0723 # 05 Y:2006 | 05 | 2006 | PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT | $3,531 | $5,250 | Implemented |
OK0723 # 06 Y:2006 | 06 | 2006 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $13,876 | $17,879 | Implemented |
OK0723 # 08 Y:2006 | 08 | 2006 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $23,096 | $42,002 | Implemented |
UF0374 # 02 Y:2006 | 02 | 2006 | INSULATE BARE EQUIPMENT | $43,329 | $868 | Implemented |
UF0374 # 03 Y:2006 | 03 | 2006 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $9,278 | $12,817 | Implemented |
UF0374 # 05 Y:2006 | 05 | 2006 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $7,506 | $4,360 | Implemented |