IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

142

matching recommendations
Reset
NAICS 332811 Metal Heat Treating
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UM0372 # 09 Y:2010 09 2010 COVER OPEN TANKS $9,602 $2,472 Implemented
MA0665 # 01 Y:2010 01 2010 UPGRADE CONTROLS ON COMPRESSORS $15,680 $58,600 Implemented
MA0665 # 02 Y:2010 02 2010 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $3,642 $18,330 Implemented
MA0665 # 04 Y:2010 04 2010 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $1,470 $200 Implemented
MA0665 # 06 Y:2010 06 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,028 $480 Implemented
MA0665 # 07 Y:2010 07 2010 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $155 $180 Implemented
LL0328 # 01 Y:2010 01 2010 INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN $26,498 $304 Implemented
LL0328 # 02 Y:2010 02 2010 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $9,654 $3,600 Implemented
LL0328 # 03 Y:2010 03 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,572 $2,800 Implemented
TT0029 # 01 Y:2008 01 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,600 $12,000 Implemented
TT0029 # 02 Y:2008 02 2008 INSULATE BARE EQUIPMENT $52,700 $1,000 Implemented
TT0029 # 07 Y:2008 07 2008 OPTIMIZE PLANT POWER FACTOR $4,855 $13,300 Implemented
AM0543 # 01 Y:2008 01 2008 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $95,000 $175,000 Implemented
AM0543 # 03 Y:2008 03 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $627 $0 Implemented
AM0543 # 04 Y:2008 04 2008 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $205 $54 Implemented
MA0625 # 02 Y:2007 02 2007 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $8,935 $8,000 Implemented
MA0625 # 05 Y:2007 05 2007 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $3,964 $10,530 Implemented
OK0723 # 01 Y:2006 01 2006 OPERATE BOILERS ON HIGH FIRE SETTING $23,600 $18,000 Implemented
OK0723 # 03 Y:2006 03 2006 USE INSULATION IN FURNACES TO FACILITATE HEATING / COOLING $1,135 $587 Implemented
OK0723 # 05 Y:2006 05 2006 PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT $3,531 $5,250 Implemented
OK0723 # 06 Y:2006 06 2006 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $13,876 $17,879 Implemented
OK0723 # 08 Y:2006 08 2006 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $23,096 $42,002 Implemented
UF0374 # 02 Y:2006 02 2006 INSULATE BARE EQUIPMENT $43,329 $868 Implemented
UF0374 # 03 Y:2006 03 2006 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $9,278 $12,817 Implemented
UF0374 # 05 Y:2006 05 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,506 $4,360 Implemented