IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

313

matching recommendations
Reset
NAICS 332811 Metal Heat Treating
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
LE0389 # 01 Y:2015 01 2015 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $1,935 $450 Implemented
LE0389 # 02 Y:2015 02 2015 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $8,547 $4,500 Implemented
LE0389 # 03 Y:2015 03 2015 REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER $21,418 $21,650 Implemented
LE0389 # 04 Y:2015 04 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $642 $1,000 Implemented
LE0389 # 05 Y:2015 05 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $19,458 $81,373 Implemented
LE0389 # 06 Y:2015 06 2015 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $4,484 $20,000 Not Implemented
OK0888 # 01 Y:2014 01 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,503 $1,800 Implemented
OK0888 # 02 Y:2014 02 2014 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,709 $0 Not Implemented
OK0888 # 03 Y:2014 03 2014 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $709 $1,293 Not Implemented
OK0888 # 04 Y:2014 04 2014 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $13,683 $6,800 Implemented
OK0888 # 05 Y:2014 05 2014 INSULATE BARE EQUIPMENT $843 $1,390 Not Implemented
OK0888 # 06 Y:2014 06 2014 REPAIR FURNACES AND OVEN DOORS SO THAT THEY SEAL EFFICIENTLY $6,388 $4,000 Implemented
OK0888 # 07 Y:2014 07 2014 RECOVER WASTE HEAT FROM EQUIPMENT $52,633 $210,000 Not Implemented
OK0888 # 08 Y:2014 08 2014 USE RADIANT HEATER FOR SPOT HEATING $1,977 $0 Implemented
OK0888 # 09 Y:2014 09 2014 OPTIMIZE PLANT POWER FACTOR $9,969 $6,825 Not Implemented
WM0048 # 04 Y:2014 04 2014 INSTALL OCCUPANCY SENSORS $733 $570 Not Implemented
WM0048 # 05 Y:2014 05 2014 OPTIMIZE PLANT POWER FACTOR $5,162 $24,038 Implemented
WM0048 # 03 Y:2014 03 2014 REPAIR AND ELIMINATE STEAM LEAKS $2,471 $270 Implemented
WM0048 # 02 Y:2014 02 2014 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $18,624 $53,646 Implemented
WM0048 # 01 Y:2014 01 2014 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $3,124 $239 Implemented
SF0444 # 02 Y:2014 02 2014 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,108 $4,124 Not Implemented
SF0444 # 03 Y:2014 03 2014 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $7,895 $22,758 Not Implemented
SF0444 # 04 Y:2014 04 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $404 $1,967 Implemented
SF0444 # 05 Y:2014 05 2014 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $8,642 $40,100 Not Implemented
SF0444 # 01 Y:2014 01 2014 RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR $9,479 $8,763 Not Implemented