IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

278

matching recommendations
Reset
NAICS 332812 Metal Coating, Engraving (except Jewelry and Silverware), and Allied Services to Manufacturers
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IP0112 # 10 Y:2019 10 2019 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $11,070 $21,274 Implemented
IP0112 # 11 Y:2019 11 2019 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $7,283 $30,250 Implemented
IP0110 # 01 Y:2018 01 2018 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $23,973 $5 Implemented
IP0110 # 03 Y:2018 03 2018 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,835 $130 Implemented
IP0110 # 05 Y:2018 05 2018 INSTALL OCCUPANCY SENSORS $21,079 $3,360 Implemented
IP0110 # 06 Y:2018 06 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,905 $5,340 Implemented
IP0110 # 08 Y:2018 08 2018 INSULATE BARE EQUIPMENT $655 $945 Implemented
IP0110 # 09 Y:2018 09 2018 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $11,070 $21,274 Implemented
IP0110 # 10 Y:2018 10 2018 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $7,081 $30,250 Implemented
SD0573 # 06 Y:2018 06 2018 INSTALL OCCUPANCY SENSORS $64 $63 Implemented
SD0573 # 05 Y:2018 05 2018 USE PHOTOCELL CONTROLS $1,115 $2,775 Implemented
SD0573 # 04 Y:2018 04 2018 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,699 $900 Implemented
SD0573 # 03 Y:2018 03 2018 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $4,330 $10,000 Implemented
SD0573 # 02 Y:2018 02 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,784 $5,838 Implemented
SD0573 # 01 Y:2018 01 2018 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $14,519 $67,626 Implemented
AM0758 # 05 Y:2018 05 2018 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $435 $250 Implemented
AM0758 # 03 Y:2018 03 2018 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $1,605 $1,500 Implemented
AM0758 # 07 Y:2018 07 2018 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $155 $50 Implemented
AM0758 # 06 Y:2018 06 2018 INSTALL OCCUPANCY SENSORS $485 $320 Implemented
LE0445 # 05 Y:2017 05 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,741 $6,692 Implemented
LE0445 # 04 Y:2017 04 2017 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $525 $750 Implemented
LE0445 # 02 Y:2017 02 2017 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,590 $1,500 Implemented
LE0445 # 01 Y:2017 01 2017 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,107 $1,000 Implemented
MI0313 # 06 Y:2017 06 2017 KEEP DOORS AND WINDOWS SHUT WHEN NOT ON USE $1,082 $249 Implemented
MI0313 # 09 Y:2017 09 2017 INSTALL OCCUPANCY SENSORS $164 $574 Implemented