IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

33

matching recommendations
Reset
NAICS 332812 Metal Coating, Engraving (except Jewelry and Silverware), and Allied Services to Manufacturers
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MZ0358 # 04 Y:2024 04 2024 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $1,826 $1,760 n/a
MZ0358 # 07 Y:2024 07 2024 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT INCOMING FLUIDS $4,887 $14,220 n/a
MZ0358 # 05 Y:2024 05 2024 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,179 $320 n/a
MZ0358 # 01 Y:2024 01 2024 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $9,335 $1,200 n/a
MZ0358 # 02 Y:2024 02 2024 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,322 $200 n/a
MZ0358 # 03 Y:2024 03 2024 INSTALL OCCUPANCY SENSORS $1,050 $2,050 n/a
MZ0358 # 06 Y:2024 06 2024 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $8,666 $2,000 n/a
MZ0085 # 04 Y:2012 04 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,801 $8,200 Implemented
MZ0085 # 01 Y:2012 01 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,648 $820 Not Implemented
MZ0085 # 02 Y:2012 02 2012 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC $79,573 $6,500 Implemented
MZ0085 # 03 Y:2012 03 2012 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC $72,621 $8,500 Implemented
IA0370 # 10 Y:2005 10 2005 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $13,492 $9,397 Not Implemented
IA0370 # 09 Y:2005 09 2005 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $6,049 $5,655 Not Implemented
IA0370 # 02 Y:2005 02 2005 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,415 $45 Not Implemented
IA0370 # 08 Y:2005 08 2005 INSTALL OCCUPANCY SENSORS $4,488 $4,081 Not Implemented
IA0370 # 07 Y:2005 07 2005 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $3,192 $0 Implemented
IA0370 # 06 Y:2005 06 2005 DISCONNECT BALLASTS $1,208 $1,260 Not Implemented
IA0370 # 05 Y:2005 05 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $738 $1,792 Not Implemented
IA0370 # 04 Y:2005 04 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,500 $20,993 Implemented
IA0370 # 03 Y:2005 03 2005 RECOVER WASTE HEAT FROM EQUIPMENT $6,432 $955 Not Implemented
IA0370 # 01 Y:2005 01 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,763 $1,492 Implemented
BD0266 # 11 Y:2004 11 2004 $3,200 $96 Implemented
BD0266 # 08 Y:2004 08 2004 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $329 $510 Implemented
BD0266 # 06 Y:2004 06 2004 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $504 $220 Implemented
BD0266 # 05 Y:2004 05 2004 INSTALL OCCUPANCY SENSORS $703 $1,425 Implemented